PEMILIHAN PEMASOK BERKELANJUTAN DALAM INDUSTRI 4.0 DI PT.XYZ

Monica Permatasari, . (2021) PEMILIHAN PEMASOK BERKELANJUTAN DALAM INDUSTRI 4.0 DI PT.XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (297kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (325kB)
[img] Text
BAB 2.pdf

Download (683kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (399kB) | Request a copy
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (791kB) | Request a copy
[img] Text
BAB 5.pdf

Download (299kB)
[img] Text
Daftar Pustaka.pdf

Download (347kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (194kB) | Request a copy
[img] Text
Lampiran.pdf
Restricted to Repository UPNVJ Only

Download (2MB) | Request a copy
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (825kB) | Request a copy

Abstract

PT XYZ is one of the automotive companies in Indonesia, there are complaints of delays in the supply of materials to PT XYZ in 2019-2020 about 15% of the total fleet issued. Delays that occur result in loss of turnover. PT XYZ only assesses subjectively based on price, quality, delivery, and safety. Therefore, the need for more comprehensive and objective considerations according to company needs. In this research, the Analytic Network Process (ANP) method is used to weight the criteria and test the level of consistency of the pairwise comparison matrix and if the matrix is consistent, it will be continued with the Technique for Others Reference by Similarity to the method. Ideal Solution (TOPSIS) to rank and determine the selected alternative supplier by using the criteria weight input decision-making. There are 3 perspective criteria, namely: economic, environmental, and social and 12 sub-criteria the highest weight economic criteria is quality and the lowest is environmental reliability, the highest weight is waste handling and the lowest weight is green design ability, the social criteria is the highest weight is complying with policies and the lowest is support for the local community. The priority order of suppliers for raw materials at PT. X includes supplier A with a preference value of 0.81, supplier B of 0.36, and supplier C with the lowest value of 0.34 but the need for additional criteria and sub-criteria so that the accuracy level in the selection of alternative suppliers at PT X increases

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1710312003] [Pembimbing: Alina Cynthia Dewi] [Penguji 1: Donny Montreano] [Penguji 2: Akhmad Nidhomuz Zaman]
Uncontrolled Keywords: Supplier, Perspective, Analytic Network Process, Technique For Others Reference by Similarity to Ideal Solution (TOPSIS), green design
Subjects: A General Works > AS Academies and learned societies (General)
Q Science > Q Science (General)
Z Bibliography. Library Science. Information Resources > Z719 Libraries (General)
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Monica Permatasari
Date Deposited: 22 Sep 2021 04:20
Last Modified: 22 Sep 2021 04:20
URI: http://repository.upnvj.ac.id/id/eprint/11425

Actions (login required)

View Item View Item