PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ

Farhan Febrian Putra, . (2021) PERANCANGAN PENJADWALAN PERAWATAN MESIN MIXER TRANSPARANT SOAP DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DAN AGE REPLACEMENT DI PT. XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (102kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (1MB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (557kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (350kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (243kB)
[img] Text
DAFTAR RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (220kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (797kB)
[img] Text
LEMBAR PLAGIARISME.pdf
Restricted to Repository staff only

Download (13MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

To maintain a smooth production process, the need for maintenance functions on production machines must always be considered. The purpose of this study was to design a time schedule for inspection and preventive replacement of critical components on a transparent soap mixer machine with Reliability Centered Maintenance (RCM) II and Age Replacement, and to measure the percentage increase in machine reliability after preventive maintenance was carried out at PT. XYZ. The results of this research show that the critical components of the TS mixer machine are the Scrapper Motor and Gearbox components. The inspection schedule for the Scrapper Motor component is 165 hours, and the Gearbox component is 84 hours. Scheduling of preventive replacement (age replacement) for Scrapper Motor components is 157 hours, and for Gearbox components is 150 hours. Reliability before preventive maintenance was carried out was 50% for the Motor Scrapper component, and 55% for the Gearbox component. There is an increase in reliability after preventive maintenance is carried out. In the inspection schedule, reliability increased to 87% for Scrapper Motor components, and for Gearbox components increased to 99%. In preventive replacement scheduling, reliability increases to 85% for Scrapper Motor components, 86% for Gearbox components.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1810312083] [Pebimbing: Fajri Rayhan Ashfi Rayhan ] [Penguji 1: Nanang Alamsyah] [Penguji 2: Muhammad As'adi}
Uncontrolled Keywords: Scheduling, Mixer TS Machine, Reliability Centered Maintenance (RCM) II, Age Replacement
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Farhan Febrian Putra
Date Deposited: 08 Feb 2022 06:29
Last Modified: 15 Feb 2023 03:40
URI: http://repository.upnvj.ac.id/id/eprint/16154