Adinda Kania Prameswari, . (2021) FAKTOR-FAKTOR YANG MEMPENGARUHI TINGKAT KELELAHAN PEKERJA PADA MASA PANDEMI COVID-19 DI PROYEK PEMBANGUNAN RUAS JALAN TOL SERPONG-CINERE TAHUN 2021. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (52kB) |
|
Text
AWAL.pdf Download (371kB) |
|
Text
BAB 1.pdf Download (113kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (249kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (200kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (247kB) |
|
Text
BAB 5.pdf Download (72kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (114kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (29kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (3MB) |
|
Text
JURNAL.pdf Restricted to Repository staff only Download (210kB) |
Abstract
The construction service sector is one of the sectors that has a high risk of both work accidents and occupational diseases, especially during the current Covid-19 pandemic. The implementation of development activities are still carried out by implementing the Covid-19 prevention protocol. The purpose of this study was to determine the relationship between internal factors (age, nutritional status, and work period) and external factors (length of work and workload) with work fatigue to workers in the Serpong-Cinere Toll Road Development Project. This study used a quantitative analytical method with cross sectional design. The population of this study were 100 workers and sampling in this study using total sampling technique. Chi square test results obtained age was variable with p value 0.031 (p <0.05), workload with p value 0.001 (p <0.05), length of work with p value 0.001 (p <0.05), nutritional status with p value 0.964 (p> 0.05) and working period with p value 0.471 (p> 0.05). The conclusion is that age, workload and length of work are related to work fatigue. While, nutritional status and working period were not related to work fatigue. Suggestion for companies is to evaluate working hours and provide appropriate rest areas in the project area.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.panggil: 1710713116] [Ketua Penguji: Azizah Musliha Fitri] [Penguji 1: Fathinah Ranggauni Hardy] [Penguji 2 (Pembimbing): Dyah Utari] |
Uncontrolled Keywords: | Construction, work fatigue, internal factors, external factors |
Subjects: | R Medicine > RA Public aspects of medicine R Medicine > RA Public aspects of medicine > RA0421 Public health. Hygiene. Preventive Medicine |
Divisions: | Fakultas Ilmu Kesehatan > Program Studi Kesehatan Masyarakat (S1) |
Depositing User: | Adinda Kania Prameswari |
Date Deposited: | 12 Jul 2021 03:12 |
Last Modified: | 12 Jul 2021 03:12 |
URI: | http://repository.upnvj.ac.id/id/eprint/9902 |
Actions (login required)
View Item |