Ridha Amira, . (2026) MODEL MANAJEMEN RISIKO OPERASIONAL KETERLAMBATAN LRT JABODEBEK DENGAN PENDEKATAN ERM–COSO (STUDI KASUS: DATA JULI–SEPTEMBER 2025). Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
|
Text
ABSTRAK.pdf Download (132kB) |
|
|
Text
AWAL.pdf Download (919kB) |
|
|
Text
BAB 1.pdf Restricted to Repository UPNVJ Only Download (438kB) |
|
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (2MB) |
|
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (4MB) |
|
|
Text
BAB 5.pdf Restricted to Repository UPNVJ Only Download (221kB) |
|
|
Text
DAFTAR PUSTAKA.pdf Download (193kB) |
|
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (293kB) |
|
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (4MB) |
|
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (33MB) |
|
|
Text
ARTIKEL.pdf Restricted to Repository staff only Download (3MB) |
Abstract
LRT Jabodebek recorded On Time Performance (OTP) of 99.62–99.80% during July–September 2025; however, average travel delays increased progressively to 1.87 minutes, indicating operational risks requiring systematic management. This study aims to identify root causes of disruptions, assess risk levels, determine treatment priorities, and design an operational delay risk management model based on the Enterprise Risk Management (ERM)–COSO Framework. Methods employed include Fault Tree Analysis (FTA), a 4×4 Risk Matrix, risk register, heat map, and comparative analysis against January–March 2026 operational data. Results show that system integration disruptions constitute the most dominant category. Risk assessment identified five High-category priority risks: No Green Icon (NO GI), ATP Cross, Power Trip 750 VDC, Leaking Hose, and EB Derailment Detected. The proposed model comprises six systematic and adaptive cyclical stages. Comparative analysis confirms that all five priority risks remain relevant in the latest period, with NO GI persisting as the most dominant disruption.
| Item Type: | Thesis (Skripsi) |
|---|---|
| Additional Information: | [No.Panggil: 2210312029] [Pembimbing: Siti Rohana Nasution] [Penguji 1: Redian Wahyu Elanda] [Penguji 2: Donny Montreano] |
| Uncontrolled Keywords: | LRT Jabodebek, operational risk management, ERM–COSO, Fault Tree Analysis, 4×4 Risk Matrix, operational delay |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management T Technology > TF Railroad engineering and operation |
| Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
| Depositing User: | RIDHA AMIRA |
| Date Deposited: | 28 Aug 2026 07:02 |
| Last Modified: | 28 Aug 2026 07:02 |
| URI: | http://repository.upnvj.ac.id/id/eprint/52984 |
Actions (login required)
![]() |
View Item |