Muhamad Naufal, . (2025) ANALISIS IMPLEMENTASI CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) DALAM PENERAPAN K3 DI PT PLN (PERSERO) UP3 CIKUPA BANTEN TAHUN 2025. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
![]() |
Text
Abstrak.pdf Download (236kB) |
![]() |
Text
Awal.pdf Download (696kB) |
![]() |
Text
BAB 1.pdf Restricted to Repository UPNVJ Only Download (303kB) |
![]() |
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (409kB) |
![]() |
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (324kB) |
![]() |
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (593kB) |
![]() |
Text
BAB 5.pdf Download (281kB) |
![]() |
Text
Daftar Pustaka.pdf Download (262kB) |
![]() |
Text
Riwayat Hidup.pdf Restricted to Repository UPNVJ Only Download (150kB) |
![]() |
Text
Lampiran.pdf Restricted to Repository UPNVJ Only Download (3MB) |
![]() |
Text
Hasil Plagiarisme.pdf Restricted to Repository staff only Download (12MB) |
![]() |
Text
Artikel KI.pdf Restricted to Repository staff only Download (361kB) |
Abstract
The electricity industry has a high risk of workplace accidents, especially for third parties such as contractors involved in operation, maintenance and construction activities. The Contractor Safety Management System (CSMS) is an important component in PT PLN (Persero) UP3 Cikupa's efforts to ensure that all work carried out by contractors complies with applicable occupational safety and health standards. This study aims to determine the implementation of CSMS at PT PLN, evaluate its impact in reducing work accidents, and identify challenges faced during implementation. The research method used is qualitative research with a descriptive approach through observation, interviews, FGD, and analysis of relevant documents. The research informants were SPV HSSE, HSSE Officer, Procurement and Vendors. The results of this study indicate that PT PLN (Persero) UP3 has implemented CSMS systematically, including the qualification, selection, safety training, field monitoring, and contractor performance evaluation stages. Based on the analysis of the six elements of the Contractor Safety Management System (CSMS), the company's compliance rate is 99% out of 100%. The element with the lowest success rate (94%) is the procurement (selection) of goods/services element.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 2110713006] [Pembimbing: Dyah Utari] [Penguji 1: Agus Joko Susanto] [Penguji 2: Ayu Anggraeni Dyah Purbasari] |
Uncontrolled Keywords: | Contractor Safety Management System, SMK3, Kontraktor, Ketenagalistrikan |
Subjects: | R Medicine > RA Public aspects of medicine > RA0421 Public health. Hygiene. Preventive Medicine |
Divisions: | Fakultas Ilmu Kesehatan > Program Studi Kesehatan Masyarakat (S1) |
Depositing User: | MUHAMAD NAUFAL |
Date Deposited: | 15 Jul 2025 04:17 |
Last Modified: | 15 Jul 2025 04:17 |
URI: | http://repository.upnvj.ac.id/id/eprint/37642 |
Actions (login required)
![]() |
View Item |