Nail Mustafa Akram, . (2024) PERANCANGAN KEY PERFORMANCE INDICATOR (KPI) DI BIDANG OTOMOTIF UNTUK PENILAIAN KINERJA DI PT. XYZ MENGGUNAKAN PERSPEKTIF BALANCED SCORECARD DENGAN METODE FUZZY ANALYTICAL HIERARCHY PROCESS (FAHP) DAN OBJECTIVE MATRIX (OMAX). Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (294kB) |
|
Text
AWAL.pdf Download (943kB) |
|
Text
BAB 1.pdf Restricted to Repository UPNVJ Only Download (386kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (521kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (293kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (872kB) |
|
Text
BAB 5.pdf Download (296kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (237kB) |
|
Text
DAFTAR RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (144kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (9MB) |
|
Text
ARTIKEL.pdf Restricted to Repository staff only Download (402kB) |
Abstract
PT. XYZ is a company that manufactures plastic automotive parts and is continually evolving. PT. XYZ only having performance evaluations from a financial perspective is considered insufficient as a performance measurement tool. This is because many factors can affect a company's ongoing operations, and therefore, financial performance evaluation alone is not adequate to maintain the company's performance in the long term. This research aims to design comprehensive performance evaluation tools for the company using Key Performance Indicators (KPI) based on the Balanced Scorecard (BSC) perspective, weighted using the Fuzzy AHP method, and assess the company's recent period performance using the Objective Matrix scoring system. There were 7 respondents from the company who assisted in designing the KPIs and participated in the Fuzzy AHP weighting process. The research findings indicate that the Internal Business Process perspective has the highest weight compared to other perspectives, at 0.464, and the KPI with the highest weight is KPI.PBI.4 (Delayed Delivery). Scoring results using OMAX showed the company's performance at 79%, categorizing PT. XYZ's performance in the green category, which indicates good performance.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 2010312048] [Pembimbing: Nanang Alamsyah] [Penguji 1: Donny Montreano] [Penguji 2: M. Rachman Waluyo] |
Uncontrolled Keywords: | Kinerja, KPI, Balanced Scorecard, Objective Matrix |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | NAIL MUSTAFA AKRAM |
Date Deposited: | 02 Aug 2024 10:56 |
Last Modified: | 02 Aug 2024 10:56 |
URI: | http://repository.upnvj.ac.id/id/eprint/32111 |
Actions (login required)
View Item |