Siti Aminah, . (2024) OPTIMASI PENJADWALAN PRODUKSI MENGGUNAKAN PERBANDINGAN METODE CAMPBELL DUDEK SMITH (CDS), NAWAZ ENSCORE HAM (NEH) DAN PALMER PADA PT. ANUGERAH BERSAMA SEJAHTERA. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (268kB) |
|
Text
AWAL.pdf Download (903kB) |
|
Text
BAB 1.pdf Restricted to Repository UPNVJ Only Download (297kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (407kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (381kB) |
|
Text
BAB 4..pdf Restricted to Repository UPNVJ Only Download (440kB) |
|
Text
BAB 5.pdf Download (268kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (270kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (91kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (8MB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (545kB) |
Abstract
A scheduling strategy is considered optimal if it has the smallest makespan. PT Anugerah Bersama Sejahtera, as a spare parts producer, is facing the problem of delivery delays and completion time instability in 2022. To overcome this problem, a study is needed which aims to improve scheduling efficiency to reduce makespan and completion time, so as to save production time and increase output. As a company with a flowshop production system, classic heuristic methods such as Campdell Dudek Smith, Nawaz Emscore Ham, and Palmer can be used to provide optimal scheduling solutions. By running a unique iteration process for each method, the data is processed using all of these methods, and the results show that the Campdell Dudek Smith (CDS) method produces the lowest makespan of 211.67 minutes with the job sequence J6 – J2 – J5 – J1 – J4 – J3. The resulting dispatch list solution can reduce production completion time by 23 minutes or 23.78% of the initial completion time.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil : 2010312020] [Pembimbing : Siti Rohana Nasution.] [Penguji 1 : M. Rachman Waluyo,.] [Penguji 2 : Yulizar Widiatama,.] |
Uncontrolled Keywords: | Keywords : Flowshop, CDS, NEH, Palmer, makespan |
Subjects: | T Technology > T Technology (General) T Technology > TJ Mechanical engineering and machinery T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | SITI AMINAH |
Date Deposited: | 29 Jul 2024 04:03 |
Last Modified: | 29 Jul 2024 08:58 |
URI: | http://repository.upnvj.ac.id/id/eprint/31120 |
Actions (login required)
View Item |