PENGURANGAN BOTTLENECK DENGAN PENDEKATAN THEORY OF CONSTRAINTS PADA BAGIAN PRODUKSI DI PT. INDOGRAVURE

Albert Agung Bimantoro, . (2015) PENGURANGAN BOTTLENECK DENGAN PENDEKATAN THEORY OF CONSTRAINTS PADA BAGIAN PRODUKSI DI PT. INDOGRAVURE. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
AWAL.pdf

Download (761kB)
[img] Text
ABSTRAK.pdf

Download (761kB)
[img] Text
BAB I.pdf
Restricted to Repository UPNVJ Only

Download (356kB)
[img] Text
BAB II.pdf
Restricted to Repository UPNVJ Only

Download (504kB)
[img] Text
BAB III.pdf
Restricted to Repository UPNVJ Only

Download (366kB)
[img] Text
BAB IV.pdf
Restricted to Repository UPNVJ Only

Download (918kB)
[img] Text
BAB V.pdf

Download (257kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (355kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (266kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (700kB)
[img] Text
JURNAL.pdf
Restricted to Repository staff only

Download (613kB)

Abstract

PT.Indogravure is a plant with the structure of the production process make to order, which is active in process of producing products to respond to order to come. In carrying out its activities PT.Indogravure should always pay attetion to production activities. There are several abstacles that occur in the production process, one of which ocurred at the work station queues products (work station) specific or often called a bottleneck. This condition causes troghput work stations in producing optimal. Purpose of this study is to reduce traffic bottleneck that occur in production at PT.Indogravure the theory of constraint method. While the benefits to be gained from this study provide input suggestion to reduce bottleneck in production line at PT.Indogravure and provide solutions to companies to reduce buildup on the production cross. The study states that for work station sandwich, IMAC, and coating require additional time for sandwich for 1400 minutes, 1290 minutes for IMAC and coating for 1820 minutes or 23,3 hours for sandwich, 21,5 hours for IMAC and coating for 30,3 hours. The time required can be solved by applying a system of overtime.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil : 0910312027] [Penguji II (Pembimbing) : Donny Montreano] [Penguji I : Frederikus Konrad] [Penguji Utama: Sambas Sundana]
Uncontrolled Keywords: TOC (Theory of Constraint), Bottleneck.
Subjects: T Technology > T Technology (General)
T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Muamar Khadafi
Date Deposited: 10 Jun 2024 02:54
Last Modified: 10 Jun 2024 02:54
URI: http://repository.upnvj.ac.id/id/eprint/30171

Actions (login required)

View Item View Item