STUDI KELAYAKAN PENGEMBANGAN GALANGAN KAPAL BARU PT XYZ LOMBOK DENGAN PEMBANGUNAN GRAVING DOCK DITINJAU DARI ASPEK TEKNIS DAN EKONOMIS

Talentha Nursetiandaru, . (2023) STUDI KELAYAKAN PENGEMBANGAN GALANGAN KAPAL BARU PT XYZ LOMBOK DENGAN PEMBANGUNAN GRAVING DOCK DITINJAU DARI ASPEK TEKNIS DAN EKONOMIS. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (190kB)
[img] Text
AWAL.pdf

Download (910kB)
[img] Text
BAB 1.pdf

Download (316kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (571kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (309kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
BAB 5.pdf

Download (306kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (293kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (292kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (428kB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (900kB)

Abstract

NTB is one of the ten priority tourism lists that have been released by the Indonesian Ministry of Tourism. It is known that the number of passenger ships operating in NTB is increasing every year. Passenger ships must dock annually. One of the shipyard companies in NTB, PT XYZ Lombok, wants to adjust to the market conditions in the area and the management of PT XYZ Lombok plans to build a graving dock and other additional facilities with the aim of increasing revenue and profits for the company. The method used is an approach based on field production operations to determine workshops and other facilities. To determine the area of workshops and other supporting facilities, a numerical method is used. The design drawing process uses AutoCAD 2017 software and the investment feasibility method is calculated using the investment cost parameters, net cash flow, NPV, IRR, payback period and break event point. So that the area of the shipyard which was previously 47,360 m2 becomes 48,360 m2 after the additional area. The investment cost required for the development of this shipyard is IDR 25,000,000,000 and annual operational costs are IDR 2,000,000,000 and it is assumed that every year it will increase following the inflation assumption of 3.5%. This investment will get a return on capital in the 7th year the business is run and experience a Break Even Point in the 7th year so this investment is said to be DESERVE.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1910313002] [Pembimbing: Amir Marasabessy] [Penguji 1: Wiwin Sulistyawati] [Penguji 2: Fajri Ashfi Rayhan]
Uncontrolled Keywords: west nusa tenggara, feasibility study, graving dock
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering
Divisions: Fakultas Teknik > Program Studi Teknik Perkapalan (S1)
Depositing User: Talentha Nursetiandaru
Date Deposited: 25 Jul 2023 04:56
Last Modified: 25 Jul 2023 04:56
URI: http://repository.upnvj.ac.id/id/eprint/25548

Actions (login required)

View Item View Item