ANALISIS RISIKO KECELAKAAN KERJA DENGAN METODE HIRARC PADA PROYEK PEMBANGUNAN SKY BRIDGE REVO TOWN TAHUN 2022

Aisyah Amelia Surahman, . (2022) ANALISIS RISIKO KECELAKAAN KERJA DENGAN METODE HIRARC PADA PROYEK PEMBANGUNAN SKY BRIDGE REVO TOWN TAHUN 2022. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (11kB)
[img] Text
AWAL.pdf

Download (548kB)
[img] Text
BAB 1.pdf

Download (321kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (490kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (319kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (810kB)
[img] Text
BAB 5.pdf

Download (304kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (336kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (296kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (6MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (367kB)

Abstract

Hazard Identification Risk Assessment and Risk Control (HIRARC) is a process of hazard identification, risk assessment to determine the high or low value of a risk so as to assist in the control process. This study was conducted to analyze the risk of work accidents using the HIRARC method on the Revo Town Sky Bridge Construction Project. This type of research is qualitative, the research begins with the classification of activities contained in the Revo Town Sky Bridge Construction Project, which is then identified by hazards in each work so that the source of the hazard that is waiting for will be assessed using a risk assessment using the HIRARC method. The classification of work in the Sky Bridge Construction Project is Structural, Architectural, Mechanical, Electrical and Plumbing Work, in Architectural work there are 4 work activities, namely ceramic installation, sandwich installation, stainless railing installation, and ACP ceiling installation. The risk value in the Revo Town Sky Bridge Construction Project is as much as 26% (18 sources of danger) have a high level of risk, then 30% (21 sources of danger) have a moderate level of risk, and as many as 44% (30 sources of danger) have a risk minor work accident. Keywords: Construction, HIRARC, Risk Assessment.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1810713034] [Pembimbing: Afif Amir Amrullah] [Penguji 1: Fandita Tonyka Maharani] [Penguji 2: Azizah Musliha Fitri]
Uncontrolled Keywords: Construction, HIRARC, Risk Assessment.
Subjects: H Social Sciences > HD Industries. Land use. Labor
H Social Sciences > HD Industries. Land use. Labor > HD61 Risk Management
Divisions: Fakultas Ilmu Kesehatan > Program Studi Kesehatan Masyarakat (S1)
Depositing User: Aisyah Amelia Surahman
Date Deposited: 20 Sep 2022 13:30
Last Modified: 20 Sep 2022 13:30
URI: http://repository.upnvj.ac.id/id/eprint/20841

Actions (login required)

View Item View Item