Erna Rita Martiani, . and mulyantini, Sri (2022) EVALUASI TERHADAP KEPUTUSAN KELAYAKAN BISNIS PEMBANGUNAN PROYEK APARTEMEN SQR JAKARTA SELATAN DIMASA PANDEMI COVID-19. Tesis thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (167kB) |
|
Text
AWAL.pdf Download (644kB) |
|
Text
BAB 1.pdf Download (805kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (572kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (252kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
BAB 5.pdf Download (239kB) |
|
Text
BAB 6.pdf Download (94kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (300kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (16kB) |
|
Text
LAMPIRAN.pdf Download (3MB) |
|
Text
Turnitin Erna Rita Martiani.pdf Restricted to Repository UPNVJ Only Download (17MB) |
Abstract
This study aims to analyze the factors behind the decision-making behavior of the SQR Apartment business feasibility. In addition, this study also aims to evaluate the business feasibility decisions of the SQR Apartment project during the covid-19 pandemic and to provide an alternative strategy for the SQR Apartment project during the covid-19 pandemic. The research methodology uses descriptive qualitative methods, researchers conduct in-depth interviews and collect objective data directly at the research site, namely the SQR apartment, and then process the data and validate the data obtained. For the purpose of the first study, the data was obtained from in-depth interviews with SQR management, for the second purpose, the data was obtained from the documentation of project realization of the business decision executors, and for the third purpose, the data was obtained from the results of management interviews. The results of this study indicate that decision-making from aspects of business feasibility is motivated by the planned behavioral factor. The results of the business evaluation with the plan and actual comparison method show that this project needs to be re-evaluated because there is too much deviation.
Item Type: | Thesis (Tesis) |
---|---|
Additional Information: | No Panggil : 810121017 Pembimbing :Dr. Sri Mulyantini, S.E., M.M Penguji 1 : Dr. Dianwicaksih A., SE, Ak, M.Ak, CA Penguji 2 : Dr. Jubaedah, S.E., M.M. |
Subjects: | H Social Sciences > HB Economic Theory H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Divisions: | Fakultas Ekonomi dan Bisnis > Program Studi Manajemen (S2) |
Depositing User: | Erna Rita Martiani |
Date Deposited: | 22 Sep 2022 23:14 |
Last Modified: | 22 Sep 2022 23:14 |
URI: | http://repository.upnvj.ac.id/id/eprint/19002 |
Actions (login required)
View Item |