Carrisa Sania Andarani, . (2022) ANALISIS IMPLEMENTASI CONTRACTOR QUALITY SAFETY MANAGEMENT SYSTEM (CQSMS) DALAM PENGENDALIAN KINERJA K3 VENDOR DI PT. X TAHUN 2021. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (11kB) |
|
Text
AWAL.pdf Download (366kB) |
|
Text
BAB 1.pdf Download (94kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (263kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (59kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (379kB) |
|
Text
BAB 5.pdf Download (15kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (165kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (83kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (2MB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (10MB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (128kB) |
Abstract
The construction industry is one of the most risky sectors in terms of work accidents. The construction industry in its work uses contractor vendors to support the work. In 2018 there were 8 fatal accidents in the industrial sector and 5 of them occurred at PT. X. One of the causes of the work accident is the negligence of the contractor vendor and the absence of a system that regulates the performance of the vendor's K3. The implementation of the Contractor Quality Safety Management System (CQSMS) is one of the efforts to control contractors' HSE performance in preventing work accidents. The purpose of this study was to analyze the implementation of CQSMS in controlling the HSE performance of vendors at PT. X Year 2021. This study uses a descriptive study design with a qualitative method using in-depth interviews and observations using an audit checklist to see the implementation of CQSMS. The results showed that the application of CQSMS at PT. X 96% is in accordance with the guidelines but there are obstacles at the work in progress stage where the contractor's management commitment does not run optimally so that the risk register reporting is not updated. Therefore, socialization, training, and confirmation of contractors are needed so that all stages of the CQSMS run optimally.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No. Panggil : 1810713120] [Pembimbing 1 : Terry Yuliana R.P] [Penguji 1 : Rizki Amalia] [Penguji 2 : Azizah Musliha Fitri] |
Uncontrolled Keywords: | Implementation of K3 Management System (SMK3), Construction Industry, Work Accident, Inspection Audit |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering T Technology > TH Building construction |
Divisions: | Fakultas Ilmu Kesehatan > Program Studi Kesehatan Masyarakat (S1) |
Depositing User: | Carrisa Sania Andarani |
Date Deposited: | 28 Jun 2022 04:36 |
Last Modified: | 28 Jun 2022 04:36 |
URI: | http://repository.upnvj.ac.id/id/eprint/16979 |
Actions (login required)
View Item |