ANALISIS RISIKO PADA PROYEK KONSTRUKSI SEKRETARIAT RW (RUKUN WARGA) DENGAN METODE HOUSE OF RISK (HOR) PADA PT XYZ

Bryan Siburian, . (2021) ANALISIS RISIKO PADA PROYEK KONSTRUKSI SEKRETARIAT RW (RUKUN WARGA) DENGAN METODE HOUSE OF RISK (HOR) PADA PT XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (9kB)
[img] Text
AWAL.pdf

Download (521kB)
[img] Text
BAB 1.pdf

Download (117kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (463kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (106kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (444kB)
[img] Text
BAB 5.pdf

Download (80kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (81kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (19kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (666kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (30kB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (436kB)

Abstract

PT XYZ is a company engaged in services, especially construction. In every project that has been implemented, PT XYZ has not used project risk control in supporting the implementation of project activities. Basically, construction project activities have risks in their implementation. The risks present in construction projects can be minimized by the risk management in their implementation. Thus, the risk management of construction projects has an important role in achieving the development goals of a project. In this study the method used for project risk management is the house of risk (HOR) method with stages of risk identification, risk analysis, risk evaluation, and risk response (mitigation). From the results of risk analysis with hor method, obtained 6 priorityrisk agent items and 9 proposed mitigation actions that can be realized for preventive response and reference in the design of the company's operational standard (SOP) as guidelines in the implementation of PT XYZ construction project.

Item Type: Thesis (Skripsi)
Additional Information: No.Panggil: 1810312057 Pembimbing: Muhamad As'adi Penguji 1: Nanang Alamsyah Penguji 2: Nurfajriah
Uncontrolled Keywords: House of Risk Methods, Risk Mitigation, Project Management, Construction Management, Construction Projects
Subjects: T Technology > TH Building construction
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Bryan Siburian
Date Deposited: 09 Feb 2022 04:48
Last Modified: 09 Feb 2022 04:48
URI: http://repository.upnvj.ac.id/id/eprint/16341

Actions (login required)

View Item View Item