ANALISIS PENINGKATAN EFEKTIVITAS BONGKAR MUAT KOMODITAS DI PELABUHAN CIGADING - CILEGON

Restrinanda Syifaani, . (2022) ANALISIS PENINGKATAN EFEKTIVITAS BONGKAR MUAT KOMODITAS DI PELABUHAN CIGADING - CILEGON. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (131kB)
[img] Text
AWALAN.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (186kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (117kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (283kB)
[img] Text
BAB 5.pdf

Download (173kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (168kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (142kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (151kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (9MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (456kB)

Abstract

Initially, the port was functioned to be a support or edge so that ships and boats could be moored for activities such as ferrying, unloading, and other simple activities. With the development of the social and economic life of the population, the facilities of the port continue to grow until the very day. The port is a very important facility in the loading and unloading process. The purpose of this study is to analyze the effectiveness in the implementation of unloading rainfall using port service performance indicators in the form of Effectiveness (ET) and Productivity (Q/J). From this data, it was found that there was a decrease in the Effective Time (ET) and Productivity (Q/A) in 2019 and an increase in 2020. Some suggestions that can be given to increase the effectiveness of loading and unloading at Cigading Port are the addition of 2 (two) Ship Unloader units, conducting periodic checks and scheduled maintenance on loading and unloading facilities, re-certifying the crane operator capabilities, collaborating with BMKG for weather conditions, the addition of port jetty area and the addition of a monitoring post near the open gate area.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil : 1810313020] [Pembimbing : Bambang Sudjasta] [Penguji 1 : Amir Marasabessy] [Penguji 2 : Wiwin Sulistyawati]
Uncontrolled Keywords: Port, Effectivity, Unloading
Subjects: V Naval Science > V Naval Science (General)
Divisions: Fakultas Teknik > Program Studi Teknik Perkapalan (S1)
Depositing User: Restrinanda Syifaani
Date Deposited: 08 Feb 2022 04:46
Last Modified: 08 Feb 2022 04:46
URI: http://repository.upnvj.ac.id/id/eprint/16098

Actions (login required)

View Item View Item