ANALISIS BEBAN KERJA UNTUK MENGOPTIMALKAN TENAGA KERJA PABRIK TAHU X DENGAN METODE WORKLOAD ANALYSIS DAN WORKFORCE ANALYSIS

Cindy Meisya Putri Hidayat, . (2021) ANALISIS BEBAN KERJA UNTUK MENGOPTIMALKAN TENAGA KERJA PABRIK TAHU X DENGAN METODE WORKLOAD ANALYSIS DAN WORKFORCE ANALYSIS. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (34kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (135kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (449kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (228kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (585kB)
[img] Text
BAB 5.pdf

Download (41kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (95kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (37kB)
[img] Text
LAMPIRAN.pdf

Download (595kB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (392kB)

Abstract

Tofu factory X is one of the industries engaged in the food sector, namely by making processed soybeans into tofu. Tofu factory X is one of the tofu factories located in Depok, West Java. Problems that occur in factories are working hours that exceed and do not achieve optimal productivity levels due to the factory's inability to meet all requests, for this reason this study aims to calculate the workload of each worker to know the optimal number of workers according to the workload. with the method of Workload analysis and Workforce analysis, after that, a cost analysis is carried out to assist decision making. Based on the results of the analysis, it was found that 4 workers have a workload that exceeds the normal limit, namely operator 1 of 124%, operator 4 of 116%, operator 5 of 112%, and operator 7 of 111%. Calculation of the optimal workforce using the Workforce analysis method shows that the workers of the tofu factory X are advised to add 4 workers to each workstation with excessive workloads. Based on the cost analysis, the alternative with the lowest cost is chosen by adding overtime hours with details of the costs that come out per two months amounting to RP.5.271.676.30.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1710312016] [Pembimbing: Nurfajriah] [Penguji 1: Muhamad As'Adi] [Penguji 2: Akhmad Nidhomuz Zaman]
Uncontrolled Keywords: Workload Analysis, Work Force Analysis, Workload
Subjects: H Social Sciences > HA Statistics
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Cindy Meisya Putri Hidayat
Date Deposited: 30 Sep 2021 05:48
Last Modified: 30 Sep 2021 05:48
URI: http://repository.upnvj.ac.id/id/eprint/11832

Actions (login required)

View Item View Item