OPTIMALISASI PENJADWALAN DAN PENGENDALIAN PROYEK SISTEM INFORMASI MENGGUNAKAN CRITICAL PATH METHOD (CPM) DAN EARNED VALUE ANALYSIS (EVA)

Aziz Hasan Nurrahman Alqowi, . (2021) OPTIMALISASI PENJADWALAN DAN PENGENDALIAN PROYEK SISTEM INFORMASI MENGGUNAKAN CRITICAL PATH METHOD (CPM) DAN EARNED VALUE ANALYSIS (EVA). Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (15kB)
[img] Text
AWAL.pdf

Download (315kB)
[img] Text
BAB 1.pdf

Download (95kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (624kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (127kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (813kB)
[img] Text
BAB 5.pdf

Download (71kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (138kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (103kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (3MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (462kB)

Abstract

Planning and controlling costs and time are part of project management to ensure the project runs well. Scheduling requires Work Breakdown Structure and Network Diagrams, the more detailed the more accurate it will be. It is also necessary to identify the critical path using the Critical Path Method. Control is carried out to prevent deviations using earned value analysis. The research was conducted on an information system project at PT. X conducted by PT. JT, which provides a more accurate baseline schedule and analyzes the earned value of project at the end of February. The results showed that the proposed baseline schedule was able to reduce 17 working days or 26 calendar days and obtained 47 critical activities. In the results of the earned value analysis obtained a delay of 7 working days with an SPI value of 0.94 and a CPI of 0.93. The deviation at the end of project is estimated at Rp 22,872,691.48 and 18 working days. After crashing, the total duration is returned according to the plan with smaller losses.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil : 1710312046], [Pembimbing 1 : Muhammad As'adi], [Pembimbing 2 : Akhmad Nidhomuz Zaman], [Penguji Utama : Reda Rizal], [Penguji 1 : Santika Sari], [Penguji 2 : Muhammad As'adi]
Uncontrolled Keywords: Scheduling, controlling, work breakdown structure, critical path, earned value
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TK Electrical engineering. Electronics Nuclear engineering
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Aziz Hasan Nurrahman Alqowi
Date Deposited: 22 Sep 2021 03:54
Last Modified: 22 Sep 2021 03:54
URI: http://repository.upnvj.ac.id/id/eprint/11427

Actions (login required)

View Item View Item