STUDI KELAYAKAN USAHA PEMBANGUNAN PABRIK MOLDING PLASTIK PT X

Fachrul Akbar, . (2024) STUDI KELAYAKAN USAHA PEMBANGUNAN PABRIK MOLDING PLASTIK PT X. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (71kB)
[img] Text
AWAL.pdf

Download (909kB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (202kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (312kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (177kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (876kB)
[img] Text
BAB 5.pdf

Download (77kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (143kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (145kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (968kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (14MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (917kB)

Abstract

PT. X is a company actively involved in various aspects of the lubricant industry, including grease, specialty products, base oils, chemicals, and their raw materials. Given the high increase in lubricant demand driven by the growing number of motor vehicles in Indonesia each year, PT. X plans to establish a plastic container factory to support its lubricant production needs. To support this plan, a feasibility study on the construction of the plastic container factory needs to be conducted, covering market aspects, technical and operational aspects, management and organizational aspects, legal aspects, environmental and social aspects, financial aspects, and sensitivity analysis under optimistic, best, and pessimistic conditions for the next five years. Based on data processing for two planned locations, it was found that for the North Jakarta location, the project is feasible under optimistic conditions, with a positive NPV of Rp 199.564.844.379, a PP of 3,9 years, a PI greater than 1 at 1.19, and an IRR of 37,016%. For the Bekasi location, the project is also feasible under optimistic conditions, with a positive NPV of Rp 376.569.452.487, a PP of 2,2 years, a PI greater than 1 at 1.19, and an IRR of 104,047%.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 2010312030] [Pembimbing: Nanang Alamsyah] [Penguji 1: Halim Mahfud] [Penguji 2:Donny Montreano]
Uncontrolled Keywords: Moulding Plastic, Feasibility, Sensitivity Analysis
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
H Social Sciences > HG Finance
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: FACHRUL AKBAR
Date Deposited: 31 Jul 2024 07:07
Last Modified: 05 Aug 2024 09:07
URI: http://repository.upnvj.ac.id/id/eprint/31409

Actions (login required)

View Item View Item