ANALISIS MINIMALISASI PEMBOROSAN DENGAN PENDEKATAN LEAN MANUFACTURING PADA PRODUK KULKAS (STUDI KASUS PT. PMI)

Muhammad Oriza Syahnanda, . (2023) ANALISIS MINIMALISASI PEMBOROSAN DENGAN PENDEKATAN LEAN MANUFACTURING PADA PRODUK KULKAS (STUDI KASUS PT. PMI). Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (139kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (76kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (422kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (42kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
BAB 5.pdf

Download (76kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (82kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (21kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (3MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (16MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (468kB)

Abstract

PT. PMI has been established since 1970 as a result of cooperation between Japanese entrepreneurs and Indonesian entrepreneurs. PT. PMI produces various kinds of household products, one of which is a refrigerator. Based on observation data in the field and interviews with several operators and the person in charge of production, there are indications of waste due to defects in refrigerator products so that they must be repaired first and result in increased process time on the refrigerator product. To minimize waste or defects in these products, a method is needed to reduce it, namely the Lean manufacturing method. The tools used are the 7 waste questionnaire, VSM, VALSAT, 5why's, and simulation using promodel software. After collecting and processing data, it is found that there are 3 top wastes, namely defects, excessive transportation, and waiting. Improvements made to reduce the three wastes include checking the refrigerator cabinet jig, using a vacuum lifter machine where a time reduction of 39.71 seconds is obtained, and optimizing the number of workers in the form of combining several work activities which makes the number of operators in the docking line which was originally 21 operators to 16 operators and in the cooling unit line which was originally 17 operators to 14 operators. In addition, there is a reduction of 6 value-added activities and 2 non-value-added necessary activities due to the merging of several work activities.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1910312085] [Pembimbing 1: Santika Sari] [Pembimbing 2: Nur Fajriah] [Penguji Utama: Reda Rizal] [Penguji 1: Nanang Alamsyah] [Penguji 2: Santika Sari]
Uncontrolled Keywords: Waste, Lean manufacturing, VSM, VALSAT, 5 Why's, Simulation, Defect
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Muhammad Oriza Syahnanda
Date Deposited: 17 Jan 2024 05:03
Last Modified: 15 Feb 2024 04:46
URI: http://repository.upnvj.ac.id/id/eprint/27577

Actions (login required)

View Item View Item