PENJADWALAN & PERLAKUAN PERAWATAN MESIN DISTILASI MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DAN IMPLEMENTASI APLIKASI ODOO

Oktavian, Fariidz Tri (2023) PENJADWALAN & PERLAKUAN PERAWATAN MESIN DISTILASI MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DAN IMPLEMENTASI APLIKASI ODOO. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (72kB)
[img] Text
AWAL.pdf

Download (407kB)
[img] Text
BAB 1.pdf

Download (123kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (467kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (144kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (577kB)
[img] Text
BAB 5.pdf

Download (78kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (89kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (13kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (467kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (8MB)
[img] Text
Artikel KI.pdf
Restricted to Repository staff only

Download (637kB)

Abstract

UPN Veteran Jakarta's PPIC Laboratory has plans to reactiving a Distillation Machine which has not been used for 2 years, to learning laboratory. So that’snecessary to plan the scheduling and maintenanc machine, but several failures are found in each engine component such as steam leaks, corrosion, failure of the shape components, which causes the machine decrease in engine performance & product contamination. So, researchers need to make schedule & action plan machine maintenance based on existing failures, encouraging the recall of critical components using FMEA, action plan and maintenance schedule creation using the RCM II method and implementation of the Odoo application to make digital schedule that can be accessed together in operational laboratories. The result, it was found that the distillation machine had 2 critical components, namely the boiler & the distillator tube with each RPN value of 175& 130 and the treatment for the boiler is Scheduled on Condition Task and the distillator tube is Scheduled on Condition Task & Scheduled Restoration Task for suggesting inspection time intervals every 32 hours for boiler components and 64 hours intervals for distillator tubes calculated in the cumulative calculation plus digital scheduling using odoo in this research on maintenance & repairs management modul.

Item Type: Thesis (Skripsi)
Additional Information: No Panggil: 1910312053 Pembimbing 1 : Yulizar Widiatama Pembimbing 2 : Muhammad As'adi Penguji 1; Halim Mahfud Penguji 2: Donny Montreano
Uncontrolled Keywords: Distillation Machine, Maintenance, Reliability Centered Maintenance (RCM) II, Odoo
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Fariidz Tri Oktavian
Date Deposited: 07 Aug 2023 03:34
Last Modified: 07 Aug 2023 03:34
URI: http://repository.upnvj.ac.id/id/eprint/26041

Actions (login required)

View Item View Item