Fauzan Rezki Maulana, . (2023) PERANCANGAN RACI MATRIX UNTUK MENGELOLA STAKEHOLDERS DALAM STUDI KASUS PROYEK PT XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (10kB) |
|
Text
AWAL.pdf Download (483kB) |
|
Text
BAB 1.pdf Download (127kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (365kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (56kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (712kB) |
|
Text
BAB 5.pdf Download (13kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (132kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (18kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (725kB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (8MB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (511kB) |
Abstract
PT XYZ is a company engaged in the Event Organizer field in collaboration with the Ministry of Transportation of the Republic of Indonesia. Based on the results of observations through interviews, field observations, and studies of company documents in the PT XYZ event organizer case study, it was found that there were projects that experienced delays and cost overruns. After being analyzed, the authors concluded that this was caused by poor integration about roles and responsibilities in every stakeholders. Because of this, one method that is suitable to be used and implemented is the RACI Matrix. This study aims to design the RACI Matrix and Job Description List in accordance with project management guidelines. For work assignments in the PT XYZ case study project, the results of the RACI Matrix design show nine stakeholders grouped into four classifications according to the RACI components arranged based on the responsibilities of each stakeholder towards the project. The results of the Job Description design show five stakeholders who are further explained about their job descriptions. And the results of the Gantt Chart design show the scheduling for all job descriptions.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 1910312033] [Pembimbing: Muhammad As'Adi] [Penguji 1: Siti Rohana Nasution] [Penguji 2: M. Rachman Waluyo] |
Uncontrolled Keywords: | Stakeholders, Project Management, RACI Matrix, Job Description, and Gantt Chart |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | Fauzan Rezki Maulana |
Date Deposited: | 31 Jul 2023 04:32 |
Last Modified: | 31 Jul 2023 04:32 |
URI: | http://repository.upnvj.ac.id/id/eprint/24670 |
Actions (login required)
View Item |