Aziz Hasan Nurrahman Alqowi, . (2021) OPTIMALISASI PENJADWALAN DAN PENGENDALIAN PROYEK SISTEM INFORMASI MENGGUNAKAN CRITICAL PATH METHOD (CPM) DAN EARNED VALUE ANALYSIS (EVA). Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (15kB) |
|
Text
AWAL.pdf Download (315kB) |
|
Text
BAB 1.pdf Download (95kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (624kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (127kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (813kB) |
|
Text
BAB 5.pdf Download (71kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (138kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (103kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (3MB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (462kB) |
Abstract
Planning and controlling costs and time are part of project management to ensure the project runs well. Scheduling requires Work Breakdown Structure and Network Diagrams, the more detailed the more accurate it will be. It is also necessary to identify the critical path using the Critical Path Method. Control is carried out to prevent deviations using earned value analysis. The research was conducted on an information system project at PT. X conducted by PT. JT, which provides a more accurate baseline schedule and analyzes the earned value of project at the end of February. The results showed that the proposed baseline schedule was able to reduce 17 working days or 26 calendar days and obtained 47 critical activities. In the results of the earned value analysis obtained a delay of 7 working days with an SPI value of 0.94 and a CPI of 0.93. The deviation at the end of project is estimated at Rp 22,872,691.48 and 18 working days. After crashing, the total duration is returned according to the plan with smaller losses.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No. Panggil : 1710312046], [Pembimbing 1 : Muhammad As'adi], [Pembimbing 2 : Akhmad Nidhomuz Zaman], [Penguji Utama : Reda Rizal], [Penguji 1 : Santika Sari], [Penguji 2 : Muhammad As'adi] |
Uncontrolled Keywords: | Scheduling, controlling, work breakdown structure, critical path, earned value |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management T Technology > TA Engineering (General). Civil engineering (General) T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | Aziz Hasan Nurrahman Alqowi |
Date Deposited: | 22 Sep 2021 03:54 |
Last Modified: | 22 Sep 2021 03:54 |
URI: | http://repository.upnvj.ac.id/id/eprint/11427 |
Actions (login required)
View Item |