ANALISIS SISTEM PERENCANAAN DAN PENJADWALAN PERAWATAN PERALATAN PRODUKSI DI PT. DOK DAN PERKAPALAN KODJA BAHARI GALANGAN III

Alfiah Amalia, . (2021) ANALISIS SISTEM PERENCANAAN DAN PENJADWALAN PERAWATAN PERALATAN PRODUKSI DI PT. DOK DAN PERKAPALAN KODJA BAHARI GALANGAN III. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (309kB)
[img] Text
AWAL.pdf

Download (552kB)
[img] Text
BAB 1.pdf

Download (73kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (337kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (74kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (596kB)
[img] Text
BAB 5.pdf

Download (64kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (62kB)
[img] Text
RIWAYAT HIDUP.pdf.pdf
Restricted to Repository UPNVJ Only

Download (528kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (936kB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (199kB)

Abstract

Pt. Dock & Shipping Kodja Bahari Galangan III is a shipyard that has products and services include 3 things, namely shipbuilding, ship repair, and non-ship. For maximum achievement and high production, must be supported by good and efficient resources and equipment. Likewise in shipbuilding. Many factors cause production delays, including the condition of production equipment. Job safety in the shipping world is also important and cannot be ignored. The safety of workers and equipment operators is a factor that makes the maintenance of ship loading equipment. To avoid major losses, production equipment must be carried out planning and scheduling maintenance so as not to impact on financial losses for the industry itself as well as the safety of workers or operators. The Company uses preventive maintenance techniques so that scheduling maintenance or maintenance on production equipment is carried out every 3 months to avoid large-scale damage and financial losses for the company, but if a production tool has reached the limit of the specified hour meter and damage has occurred according to the equipment operator, then an unscheduled inspection is carried out at the time of repair on all parts and units of the damaged equipment. Preventive maintenance is carried out, the percentage of damage to small equipment occurs in production accidents so as to ensure the safety of the operator of the tool.

Item Type: Thesis (Skripsi)
Additional Information: [No. panggil: 1710313009] [Pembimbing 1:M. Rusdy Hatuwe] [Penguji 1:Amir Marasabessy] [Pembimbing 2:Bambang Sudjasta]
Uncontrolled Keywords: equipment production, maintenance, planning and scheduling
Subjects: V Naval Science > V Naval Science (General)
Divisions: Fakultas Teknik > Program Studi Teknik Perkapalan (S1)
Depositing User: Alfiah Amalia
Date Deposited: 15 Mar 2021 04:26
Last Modified: 15 Mar 2021 04:26
URI: http://repository.upnvj.ac.id/id/eprint/9197

Actions (login required)

View Item View Item