ANALISIS EFISIENSI TURBIN UAP PADA PLTGU BLOK I TANJUNG PRIOK BERDASARKAN POLA OPERASI DENGAN MENGGUNAKAN CYCLE TEMPO

Muhammad Rafif, . (2020) ANALISIS EFISIENSI TURBIN UAP PADA PLTGU BLOK I TANJUNG PRIOK BERDASARKAN POLA OPERASI DENGAN MENGGUNAKAN CYCLE TEMPO. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (2MB)
[img] Text
AWAL.pdf

Download (3MB)
[img] Text
BAB 1.pdf

Download (1MB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (612kB)
[img] Text
BAB 5.pdf

Download (1MB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (1MB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
ARTIKEL.pdf
Restricted to Repository UPNVJ Only

Download (566kB)

Abstract

Increasing electricity needs must be adjusted to the increasing amount of electricity produced. In addition, the generation process must also develop in a better direction, one of which is to increase the efficiency of the plant. The pattern of operation in the operation of steam turbines at PLTGU was created as a way to increase the power generated, so that the generating system could work more efficiently by adding the use of HRSG. This study uses 3 types of operating patterns, namely 1- 1-1 (1 gas turbine, 1 HRSG and 1 steam turbine), 2-2-1 operating pattern (2 gas turbine, 2 HRSG and 1 steam turbine) and 3-3-1 operating pattern (3 gas turbines, 3 HRSG and 1 steam turbine). The method used to retrieve data is using digital data at Central Control Room that the similarity has been verified with analog data used by field operator. Data used for this research is is the operation of PLTGU in January 2019-June 2019 with a load capacity of 85 MW, 100 MW and 120 MW. The calculation process is carried out by utilizing the thermodynamic formula and software cycle tempo. This research found that there that every change in operating patterns there is an increase in efficiency with a load of 85 MW from 20.34% to 21.93%, with a load of 100 MW from 20.56% to 22.39% and with a load of 120 MW from 20.63 % to 21.43%.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil : 1610311017] [Pembimbing : Muhamad As’adi] [Penguji Utama : M. Arifudin L] [Penguji Lembaga :Damora Rhakasywi]
Uncontrolled Keywords: efficiency, steam turbine, operating pattern, cycle temp0
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Teknik > Program Studi Teknik Mesin (S1)
Depositing User: Muhammad Rafif
Date Deposited: 28 Jun 2021 02:21
Last Modified: 28 Jun 2021 02:21
URI: http://repository.upnvj.ac.id/id/eprint/7119

Actions (login required)

View Item View Item