ANALISIS EFEKTIVITAS MESIN PRODUKSI AIR MINUM DALAM KEMASAN (AMDK) MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PT XYZ

Muhammad Ashabul Kahfi, . (2026) ANALISIS EFEKTIVITAS MESIN PRODUKSI AIR MINUM DALAM KEMASAN (AMDK) MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PT XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (311kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (348kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (615kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (382kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (753kB)
[img] Text
BAB 5.pdf

Download (334kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (294kB)
[img] Text
DAFTAR RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (204kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (644kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (8MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (821kB)

Abstract

This study aims to assess the effectiveness of bottled drinking water (AMDK) machines using the Overall Equipment Effectiveness (OEE) method and explore the main causes of production loss through Six Big Losses, Pareto Analysis, and Fault Tree Analysis (FTA) analysis. The focus of this study is on the 220 ml cup bottled water machine which experienced a decrease in performance during the observation period. From the results of production data processing, an initial OEE value of 54.9% was obtained, which shows that the effectiveness of the machine is still below the optimal performance level. Furthermore, a major cause analysis was carried out using the Fault Tree Analysis (FTA) method to formulate improvement suggestions that focused on reducing downtime, increasing machine operation speed, and reducing the number of defective products. The results of the simulation of the implementation of improvement suggestions showed an increase in the OEE value to 71.3%, which increased by 16.4%. This increase was due to a reduction in operational downtime, which can be seen from an increase in availability rate of 8.03%, an increase in performance rate of 11.2%, and a decrease in the number of defective products as indicated by an increase in quality rate of 2.1%. The findings of this study show that the proposed improvement suggestions are effective in improving the overall performance of the engine. Therefore, it is recommended that companies implement continuous improvement recommendations, especially related to engine speed standardization, sealing temperature regulation, and the use of engine checklists, and also carry out training for operators and monitor OEE regularly as part of standard operating procedures (SOPs).

Item Type: Thesis (Skripsi)
Additional Information: [No Panggil: 2110312090] [Pembimbing: Muhamad As’Adi] [Penguji 1: Donny Montreano] [Penguji 2: Siti Rohana Nasution]
Uncontrolled Keywords: Overall Equipment Effectiveness, Fault Tree Analysis, Six Big Losses, AMDK
Subjects: T Technology > T Technology (General)
T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: MUHAMMAD ASHABUL KAHFI
Date Deposited: 26 Jan 2026 05:51
Last Modified: 26 Jan 2026 05:51
URI: http://repository.upnvj.ac.id/id/eprint/42092

Actions (login required)

View Item View Item