Muhamad Arif Rahmansyah Putra, . (2025) ANALISIS EFEKTIVITAS MESIN PRESS DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE). Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
|
Text
ABSTRAK.pdf Download (174kB) |
|
|
Text
AWAL.pdf Download (558kB) |
|
|
Text
BAB 1.pdf Restricted to Repository UPNVJ Only Download (557kB) |
|
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (364kB) |
|
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (713kB) |
|
|
Text
BAB 5.pdf Download (241kB) |
|
|
Text
DAFTAR PUSTAKA.pdf Download (201kB) |
|
|
Text
DAFTAR RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (279kB) |
|
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (5MB) |
|
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (10MB) |
|
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (549kB) |
Abstract
Machine effectiveness plays a strategic role in ensuring smooth production processes and achieving company targets. This study aims to evaluate the performance of a press machine at PT TOA Galva Industries using the Overall Equipment Effectiveness (OEE) method, analyze the sources of loss through the Six Big Losses approach, and identify root causes using Fault Tree Analysis (FTA). Data were collected throughout February 2025 through direct observation and machine operation reports.The analysis showed an OEE value of 66.16%, which falls below the industry standard of 85%. The major contributing losses were identified as Reduced Speed Loss (50%), Idling and Minor Stoppages (22%), and Breakdown Loss (15%). FTA FTA reveals that the decline in effectiveness is driven by a combination of mechanical failures, sensor and control disturbances, as well as operator interventions. Therefore, corrective actions should focus on preventive maintenance of critical components, enhancing the reliability of control and sensor systems, and improving operator competence through training and standardized work procedures.
| Item Type: | Thesis (Skripsi) |
|---|---|
| Additional Information: | [No.Panggil: 2110312093] [Pembimbing: Muhamad As'adi] [Penguji 1 : Nanang Alamsyah] [Penguji 2 : Rachman Waluyo] |
| Uncontrolled Keywords: | OEE, Six Big Losses, Fault Tree Analysis, Machine Effectiveness, Preventive Maintenance |
| Subjects: | T Technology > T Technology (General) T Technology > TA Engineering (General). Civil engineering (General) |
| Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
| Depositing User: | MUHAMAD ARIF RAHMANSYAH PUTRA |
| Date Deposited: | 21 Jan 2026 09:42 |
| Last Modified: | 22 Jan 2026 03:10 |
| URI: | http://repository.upnvj.ac.id/id/eprint/41944 |
Actions (login required)
![]() |
View Item |
