Muhammad Hafif Fahrizi, . (2024) PENGENDALIAN KUALITAS PADA PROSES FINAL ASSEMBLY PRODUKSI POMPA AIR SUMUR DANGKAL DENGAN METODE SIX SIGMA DI PT X. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (273kB) |
|
Text
AWAL.pdf Download (1MB) |
|
Text
BAB 1.pdf Restricted to Repository UPNVJ Only Download (375kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (621kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (390kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (2MB) |
|
Text
BAB 5.pdf Download (286kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (279kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (169kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (5MB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (18MB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (803kB) |
Abstract
Shallow Well Water Pump is one of the best-selling and most widely produced products by PT X. The purpose of this study is to make quality control efforts to minimize the level of defects of the product so that it remains in accordance with the company's standards. This research was conducted using Six Sigma DMAIC. The Define stage in this study uses 9 item requirements in Critical to Quality (CTQ) and SIPOC Diagram which describes the company's flow. In the Measure stage, 4 dominant types of defects were obtained based on the Pareto Diagram, namely Impeller Noise, Impeller Stuck, Mechanical Seal Leakage & Periodic Noise, then DPMO of 2674.786 and Sigma Level of 4.29. The Analyze stage in this study uses Fault Tree Analysis (FTA) which analyzes the factors that cause the dominant defect type and then Failure Mode and Effects Analysis which identifies the severity, frequency, and detection to find out the process of the dominant defect type that is a priority to be corrected. The Improve stage in this study was carried out with 5W+1H which identified how the right improvement proposal was with a 10:1 inspection. The results of the implementation of this improvement proposal are supported by the reduction of the DPMO value to 2127.033 and the increase in the Sigma Level value to 4.36 at the Control stage.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 2010312091] [Pembimbing: Mohammad Rachman Waluyo] [Penguji 1: Halim Mahfud] [Penguji 2: Donny Montreano] |
Uncontrolled Keywords: | Quality Control, Defect, Six Sigma |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management T Technology > TA Engineering (General). Civil engineering (General) T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | MUHAMMAD HAFIF FAHRIZI |
Date Deposited: | 02 Aug 2024 02:03 |
Last Modified: | 02 Aug 2024 02:03 |
URI: | http://repository.upnvj.ac.id/id/eprint/31767 |
Actions (login required)
View Item |