REDUKSI WASTE DENGAN PENERAPAN LEAN MANUFACTURING PADA PROSES PRODUKSI GLASSFIBRE REINFORCED CONCRETE (GRC) KRAWANGAN DI PABRIK XYZ

Ester Maria Elizabeth, . (2023) REDUKSI WASTE DENGAN PENERAPAN LEAN MANUFACTURING PADA PROSES PRODUKSI GLASSFIBRE REINFORCED CONCRETE (GRC) KRAWANGAN DI PABRIK XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (11kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (299kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (517kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (133kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (4MB)
[img] Text
BAB 5.pdf

Download (78kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (81kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (38kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (26MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (1MB)

Abstract

The XYZ factory is a factory that produces GRC Krawangan products. From observations, there are inefficiencies caused by disorganized layout, irregular material handling, unnecessary movements, and waiting times. The identified waste can be analyzed for its causes and minimized to enhance production efficiency through Lean Manufacturing approaches. This research employs methods such as Value Stream Mapping (VSM), Value Stream Analysis Tool (VALSAT), Process Activity Mapping (PAM), Failure Mode Effect and Analysis (FMEA), and Fault Tree Analysis (FTA). The research results revealed a ranking of the 7 wastes, with the highest being waste in transportation, unnecessary motion, and waiting. These wastes were then assessed using VALSAT, and PAM emerged as the selected tool. Subsequently, FMEA data collection identified 7 sub-wastes exceeding Critical RPN. These sub-wastes were further analyzed using FTA. Based on the waste analysis through various methods, improvement proposals were made. These include enhancing facility layout with BLOCPLAN software, increasing the layout score from 0.72 to 0.99. The research also suggests the use of adjustable desk aids, successfully reducing the REBA score from 9 to 6. Additionally, in PAM, total activity improvement amounted to 129 by eliminating 9 activities, leading to a decrease in activity time from 98,862.69 to 97,495.72 seconds.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 2010312095] [Pembimbing: Siti Rohana Nasution] [Penguji 1: Muhammad As'Adi] [Penguji 2: Yulizar Widiatama]
Uncontrolled Keywords: Lean Manufacturing, VSM, VALSAT, FMEA, FTA
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Ester Maria Elizabeth
Date Deposited: 22 Jan 2024 03:17
Last Modified: 13 Feb 2024 06:09
URI: http://repository.upnvj.ac.id/id/eprint/28075

Actions (login required)

View Item View Item