Zahra Putri Wardana, . (2023) ANALISIS RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) DENGAN MENGGUNAKAN METODE HAZID, HIRA, FINE, DAN HAZOP PADA JIRAK WATERFLOOD PROJECT. Tugas Akhir thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (11kB) |
|
Text
AWAL.pdf Download (423kB) |
|
Text
BAB 1.pdf Download (104kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (295kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (266kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (769kB) |
|
Text
BAB 5.pdf Download (18kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (143kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (82kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (2MB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (200kB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (293kB) |
Abstract
Basically, construction project activities are efforts to fulfill human needs. The construction process involves the use of heavy equipment, hazardous chemicals, and strenuous physical activities, so the construction industry is a sector that has a high level of work risk. This study aims to identify and analyze OHS (Occupational Health and Safety) risks using the Hazard Analysis method which consists of Hazard Identification (HAZID), Hazard Identification and Risk Assessment (HIRA), Fine, and Hazard Operability (HAZOP). Data collection techniques in this study were carried out through observation, interviews and questionnaires. Data processing techniques in this study were carried out by testing the validity and reliability tests. The data analysis technique in this study was carried out using the HAZID, HIRA, Fine, and HAZOP methods. The results obtained from this study are as many as 36 risks that have the possibility of work accidents at the Jirak Waterflood Project, in the HIRA method obtained for the Extreme (E) risk category as many as 5 risk items, in the Fine method for the Priority 1 risk category as many as 4 risk items, Priority 3 risk category with 1 risk item.
Item Type: | Thesis (Tugas Akhir) |
---|---|
Additional Information: | [No.Panggil: 1910312003] [Pembimbing: Nanang Alamsyah] [Penguji 1: Nur Fajriah] [Penguji 2: Santika Sari] |
Uncontrolled Keywords: | Occupational Health and Safety, Hazard Analysis, Work Risk Assessment |
Subjects: | Q Science > QP Physiology T Technology > TH Building construction |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | Zahra Putri Wardana |
Date Deposited: | 31 Jul 2023 01:31 |
Last Modified: | 31 Jul 2023 01:31 |
URI: | http://repository.upnvj.ac.id/id/eprint/26059 |
Actions (login required)
View Item |