ANALISIS BEBAN KERJA KARYAWAN PADA PT XYZ DENGAN METODE WORKLOAD ANALYSIS (WLA) DAN WORKFORCE ANALYSIS (WFA)

Laela Azini Novitasari, . (2023) ANALISIS BEBAN KERJA KARYAWAN PADA PT XYZ DENGAN METODE WORKLOAD ANALYSIS (WLA) DAN WORKFORCE ANALYSIS (WFA). Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
AWAL.pdf

Download (1MB)
[img] Text
ABSTRAK.pdf

Download (10kB)
[img] Text
BAB 1.pdf

Download (85kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (332kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (28kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (885kB)
[img] Text
BAB 5.pdf

Download (11kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (19kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (15kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (547kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (10MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (520kB)

Abstract

PT. XYZ is an active company in the Packaged Drinking Water sector. The company faces issues with excessive working hours and the inability of the factory to meet all demands. Therefore, the objective of this research is to estimate the workload of each worker using Work Load Analysis and Work Force Analysis methods, in order to determine the optimal number of workers that corresponds to the workload. Furthermore, a cost analysis will be conducted to support decisionmaking. The analysis results indicate that all operators experience excessive workload at all workstations, with workload calculations exceeding the normal limit of 100%. Hence. Based on the calculations using the Work Force Analysis method, it is recommended that PT. XYZ adds 3 workers. The allocation of workers is as follows: 1 person in the cup packing section, 1 person in the palette packing section, and 1 person in the curtain section. From the cost analysis results, the alternative with the lowest cost is recommended, adds 3 workers with a cost of Rp. 14.885.928

Item Type: Thesis (Skripsi)
Additional Information: Laela Aziani Novitasari 1910312005 Pembimbing : Nur Fajriah Penguji 1 : Muhammad As’adi Penguji 2 : Mohammad Rachman Waluyo
Uncontrolled Keywords: Work Load Analysis, Work Force Analysis, Workload.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Laela Aziani Novitasari
Date Deposited: 31 Jul 2023 01:25
Last Modified: 31 Jul 2023 01:25
URI: http://repository.upnvj.ac.id/id/eprint/25975

Actions (login required)

View Item View Item