ANALISIS PENGENDALIAN BAHAN BAKU EXCAVA 200 PADA PT. PINDAD MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) UNTUK MENGANTISIPASI TERJADINYA KONDISI STOCKOUT

Elvira Risha Desianty, . (2023) ANALISIS PENGENDALIAN BAHAN BAKU EXCAVA 200 PADA PT. PINDAD MENGGUNAKAN METODE MATERIAL REQUIREMENT PLANNING (MRP) UNTUK MENGANTISIPASI TERJADINYA KONDISI STOCKOUT. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (56kB)
[img] Text
AWAL.pdf

Download (2MB)
[img] Text
BAB 1.pdf

Download (332kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (700kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (488kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
BAB 5.pdf

Download (57kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (194kB)
[img] Text
DAFTAR RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (130kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (19MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (721kB)

Abstract

PT. XYZ is a manufacturing company that produces defense and security equipment, as well as products for construction and mining, including Excavators. However, the company faces inventory control issues in the production of Excavators. Three components that frequently experience stockouts are Engine Complete, Wiring Harness, and bolts. Component ordering is based on estimates or the quantity of raw materials from the previous period. The company also lacks safety stock, so if raw material delivery is delayed, production halts. This can lead to product delivery delays, customer dissatisfaction, and decreased customer satisfaction. Therefore, this study aims to analyze the raw material control of Excavators in PT. XYZ using the Material Requirement Planning (MRP) method to anticipate stockouts. The research results indicate that the optimal ordering quantity for Engine Complete is 28 units per month, Wiring Harness is 698 units per period, and Bolt B1 is 468 pcs, Bolt B2 is 34 pcs, Bolt B3 is 359 pcs, Bolt B4 is 398 pcs, and Bolt B5 is 382 pcs. To address stockouts, the company needs to maintain safety stock of 10 units of Engine Complete, 244 units of Wiring Harness, Bolt B1 by 107 pcs, Bolt B2 by 123 pcs, Bolt B3 by 73 pcs, Bolt B4 by 220 pcs, and Bolt B5 by 100 pcs. By implementing the MRP method, PT. XYZ can improve inventory control, avoid stockouts, and enhance customer satisfaction. The inventory cost analysis shows that the use of the MRP method can generate higher revenue potential of approximately Rp364,800,000,000 and save inventory costs per unit of Excavator. This study provides a recommendation for PT. XYZ to implement an effective inventory control system using the MRP method. Thus, operational processes can run smoothly and customer satisfaction can be fulfilled.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1910312069] [Pembimbing: Siti Rohana N] [Penguji 1: Donny Montreano] [Penguji 2: Yulizar Widiatama]
Uncontrolled Keywords: Safety Stock, Material Requirement Planning, Materials, Inventory Control, Stockout.
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Elvira Risha Desianty
Date Deposited: 21 Jul 2023 08:43
Last Modified: 31 Jul 2023 02:51
URI: http://repository.upnvj.ac.id/id/eprint/25700

Actions (login required)

View Item View Item