Mohamad Refhan Haikal, . (2022) ANALISIS PENENTUAN STANDAR WAKTU DAN BIAYA REPARASI KAPAL FERRY PORTLINK III MENGGUNAKAN METODE ACTIVITY BASED COSTING. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (11kB) |
|
Text
AWAL.pdf Download (14MB) |
|
Text
BAB 1.pdf Download (180kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (438kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (33kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (457kB) |
|
Text
BAB 5.pdf Download (20kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (80kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (83kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (14MB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (14MB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (325kB) |
Abstract
Over time, the development of industry in Indonesia has progressed, as well as in the marine transportation industry sector. One of the well-known sea transportation industries is the shipyard industry. This industry has the characteristics of being a labor-intensive, capital-intensive industry, and so is its technology. The increasing number of shipbuilding industries in Indonesia, causing a fairly tight competition that requires every shipbuilding industry to carry out various kinds of innovations. Likewise, in terms of cost innovation, the maintenance and repair activities of the PORTLINK III Ferry at PT. DKB Jakarta Shipyard I still use conventional calculation methods to calculate repair costs. On the other hand, there are advantages that can be achieved by shipyards when using the activity-based costing (ABC) method because each activity carried out can be traced to the amount of cost for each activity carried out. Because the ABC method is well detailed about cost, quality, and time factor. In the maintenance and repair activities of the PORTLINK III Ferry ship, the results obtained are Rp. 3,029,112,829, - while for the ABC method calculations, the results are Rp.4.640.078.758., - there is a difference in costs in the calculation of the costs of the two methods of Rp.1.610.965.929, -. The difference occurred due to delays in the ship's work process, which at the beginning was only 18 days to 27 days. In addition, there is additional work which the conventional method cannot be identified widely, but the ABC method can show the overall cost both for initial costs and additional costs. Key Words: Activity Based Costing, Conventional, Repair, PORTLINK III
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 1810313027] [Pembimbing: Bambang Sudjasta] [Penguji 1: Rusdy Hatuwe] [Penguji 2: Amir Marasabessy] |
Uncontrolled Keywords: | Activity Based Costing, Conventional, Repair, PORTLINK III |
Subjects: | V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering |
Divisions: | Fakultas Teknik > Program Studi Teknik Perkapalan (S1) |
Depositing User: | Mohamad Refhan Haikal |
Date Deposited: | 18 Aug 2022 07:11 |
Last Modified: | 18 Aug 2022 07:11 |