PERENCANAAN DERMAGA KAPAL PENGANGKUT TERNAK PADA PELABUHAN CALABAI, NUSA TENGGARA BARAT

Faddyl Riswansyah, . (2022) PERENCANAAN DERMAGA KAPAL PENGANGKUT TERNAK PADA PELABUHAN CALABAI, NUSA TENGGARA BARAT. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (85kB)
[img] Text
AWAL.pdf

Download (302kB)
[img] Text
BAB 1.pdf

Download (138kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (138kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (168kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (568kB)
[img] Text
BAB 5.pdf

Download (142kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (63kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (129kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (805kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (11MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (423kB)

Abstract

Livestock is one of the potential for economic progress in Indonesia, including the West Nusa Tenggara area which has increased every year in livestock, namely cattle. And West Nusa Tenggara is one of the supply areas for cattle as food for people's lives on several islands, such as Java and Kalimantan. With the increasing number of requests for shipments out of the island, planning must be carried out immediately to review the speed of delivery and the feasibility of cattle. The most optimal way is by planning a dock devoted to loading and unloading livestock. Planning for the construction is carried out at the port of Calabai, West Nusa Tenggara which has been registered with the sea highway and has sufficient land for the addition of a dock for transporting livestock and its facilities. In planning the jetty, the jetty type is suitable by looking at the condition of the land contour in the Calabai port. The wharf is planned to be able to anchor one cattle transporting ship to carry out loading and unloading with a size of 83 m x 15 m, the pier is equipped with two bridges as a connector between the mainland and the pier. Complimentary facilities include having a quarantine area and loading and unloading equipment. This plan was carried out as an innovation for the advancement of proper delivery for cattle and convenience for exporters of these cattle products. Keyword: Farm, Harbour, Layout

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1810313004] [Pembimbing: Bambang Sudjasta] [Penguji 1: M. Rusdy Hatuwe] [Penguji 2: Amir Marasabessy]
Uncontrolled Keywords: Farm, Harbour, Layout
Subjects: V Naval Science > V Naval Science (General)
Divisions: Fakultas Teknik > Program Studi Teknik Perkapalan (S1)
Depositing User: Faddyl Riswansyah
Date Deposited: 18 Aug 2022 07:12
Last Modified: 18 Aug 2022 07:12
URI: http://repository.upnvj.ac.id/id/eprint/19055

Actions (login required)

View Item View Item