PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ

Erika Rahmi, . (2022) PERANCANGAN PENJADWALAN PERAWATAN MESIN WRAPPER (PACKING) LINE 13 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II PADA PT XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (200kB)
[img] Text
AWAL.pdf

Download (904kB)
[img] Text
BAB 1.pdf

Download (243kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (156kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (498kB)
[img] Text
BAB 5.pdf

Download (70kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (138kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (105kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (12MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (505kB)

Abstract

PT XYZ is a company that produces food and beverages. From historical data, the wrapper engine has the highest downtime among other machines. This machine is one of the most important machines in determining the quality of the noodle production process. Failures that appear on this machine will have the potential to disrupt the production process so optimal maintenance policy planning is needed. The RCM II method is used to determine the right type of maintenance activity on a piece of equipment through analysis of the impact caused by a failure using FMEA tables and RCM II Decision Diagrams as well as a comparison of reliability after and before preventive maintenance. The results of the calculation of RPN using FMEA obtained 3 engine components that became the focus of research, Namely end sealer components, tubing conveyors, and long sealers. In the study, it was proven by the RCM II formula that the result of the maintenance interval on the end sealer was 68 hours with increasing reliability to 85%, on tubing onveyors it was 72 hours with increased reliability to 92%, on long sealer was 100 hours with increased reliability to 80%. The examination schedule in this study was made for January – December 2022.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1810312011] [Pembimbing1 : Armansya} [Penguji 1: Nurfajriah]
Uncontrolled Keywords: Reliability, Wrapper Machine, FMEA, Reliability Centered Maintenance (RCM) II.
Subjects: T Technology > TJ Mechanical engineering and machinery
T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Erika Rahmi
Date Deposited: 25 Jul 2022 09:52
Last Modified: 15 Feb 2023 03:51
URI: http://repository.upnvj.ac.id/id/eprint/18721

Actions (login required)

View Item View Item