Agam Mubaroq Ibahri, . (2022) PERANCANGAN LEAN MANUFACTURING PADA PRODUKSI REAR BAR TRD PT LAKSANA TEKHNIK MAKMUR. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (102kB) |
|
Text
AWAL.pdf Download (713kB) |
|
Text
BAB 1.pdf Download (96kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (501kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (181kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (3MB) |
|
Text
BAB 5.pdf Download (66kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (93kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (106kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (118kB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (20MB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (891kB) |
Abstract
PT Laksana Tekhnik Makmur (LTM) needs to pay attention to its production process to minimize waste. One type of product that is produced is the TRD rear bar. In this production there are other types of waste such as waste of transportation, waiting, defects, inventories, over processing, and motions. These waste problems are caused by uncontrolled production processes such as facility layout errors, messy process flows, lack of material handling tools, unused goods in the production area, defects, processes carried out at vendors outside the company, etc. In addition, there are also non-value-added activities such as waiting, rework, and excess movement of goods. These problems make the production cycle time to 123782 seconds. To reduce cycle time and eliminate waste, lean manufacturing methods are applied, namely kaizen, 7 waste questionnaires, BPM, VALSAT, PAM, facility layout design, and fishbone diagrams. By using this method, proposed improvements are found so that production waste can be eliminated, cycle time can be reduced to 7727 seconds, NNVA time from 9589 seconds to 2314 seconds, and remove NVA time of 108780.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 1810312038] [Pembimbing 1:Muchamad Oktaviandri ] [Penguji 1: Siti Rohana Nasution] [Penguji 2: M. Rachman Waluyo] |
Uncontrolled Keywords: | Lean manufacturing, waste, cycle time, PAM, BPM, VALSAT |
Subjects: | T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | Agam Mubaroq Ibahri |
Date Deposited: | 22 Jul 2022 07:59 |
Last Modified: | 15 Feb 2023 03:23 |
URI: | http://repository.upnvj.ac.id/id/eprint/18669 |
Actions (login required)
View Item |