PERANCANGAN LEAN MANUFACTURING PADA PRODUKSI REAR BAR TRD PT LAKSANA TEKHNIK MAKMUR

Agam Mubaroq Ibahri, . (2022) PERANCANGAN LEAN MANUFACTURING PADA PRODUKSI REAR BAR TRD PT LAKSANA TEKHNIK MAKMUR. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (102kB)
[img] Text
AWAL.pdf

Download (713kB)
[img] Text
BAB 1.pdf

Download (96kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (501kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (181kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (3MB)
[img] Text
BAB 5.pdf

Download (66kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (93kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (106kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (118kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (20MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (891kB)

Abstract

PT Laksana Tekhnik Makmur (LTM) needs to pay attention to its production process to minimize waste. One type of product that is produced is the TRD rear bar. In this production there are other types of waste such as waste of transportation, waiting, defects, inventories, over processing, and motions. These waste problems are caused by uncontrolled production processes such as facility layout errors, messy process flows, lack of material handling tools, unused goods in the production area, defects, processes carried out at vendors outside the company, etc. In addition, there are also non-value-added activities such as waiting, rework, and excess movement of goods. These problems make the production cycle time to 123782 seconds. To reduce cycle time and eliminate waste, lean manufacturing methods are applied, namely kaizen, 7 waste questionnaires, BPM, VALSAT, PAM, facility layout design, and fishbone diagrams. By using this method, proposed improvements are found so that production waste can be eliminated, cycle time can be reduced to 7727 seconds, NNVA time from 9589 seconds to 2314 seconds, and remove NVA time of 108780.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1810312038] [Pembimbing 1:Muchamad Oktaviandri ] [Penguji 1: Siti Rohana Nasution] [Penguji 2: M. Rachman Waluyo]
Uncontrolled Keywords: Lean manufacturing, waste, cycle time, PAM, BPM, VALSAT
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Agam Mubaroq Ibahri
Date Deposited: 22 Jul 2022 07:59
Last Modified: 15 Feb 2023 03:23
URI: http://repository.upnvj.ac.id/id/eprint/18669

Actions (login required)

View Item View Item