ANALISIS EFEKTIVITAS MESIN MOLDING INJECTION DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN SIX BIG LOSSES SEBAGAI DASAR USULAN PERBAIKAN PADA CV. XYZ

Agusthina, . (2022) ANALISIS EFEKTIVITAS MESIN MOLDING INJECTION DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN SIX BIG LOSSES SEBAGAI DASAR USULAN PERBAIKAN PADA CV. XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
AWAL.pdf

Download (376kB)
[img] Text
ABSTRAK.pdf

Download (76kB)
[img] Text
BAB I.pdf

Download (97kB)
[img] Text
BAB II.pdf
Restricted to Repository UPNVJ Only

Download (281kB)
[img] Text
BAB III.pdf
Restricted to Repository UPNVJ Only

Download (105kB)
[img] Text
BAB IV.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB V.pdf

Download (78kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (83kB)
[img] Text
DAFTAR RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (84kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (99kB)
[img] Text
artikel KI.pdf
Restricted to Repository staff only

Download (281kB)

Abstract

CV. XYZ is a company engaged in manufacturing that produces products made from rubber, plastic, iron and steel. In this company there is a problem, one of which is regarding the maintenance of the machine, one of which is the injection molding machine which makes the machine run less effectively. So the problem to be discussed is knowing the effectiveness of the machine using the OEE method and then finding the biggest loss that affects the amount of OEE value. Then an analysis of the things that caused the greatest loss could occur using the FTA method and the FMEA weighting was carried out so that suggestions for improvements could be made using the 5W-1H method. After the calculation, the OEE value is 70.08% where this value is still below the standard set by the world. Then the biggest loss is idling and minor stoppages of 34.21% affecting the OEE value. After that, an analysis of the causes of idling and minor stoppages was carried out using the FTA method and the weighting using the FMEA method. Several reasons were found whose RPN value exceeded the average and then proposed improvements using the 5W-1H method including holding periodic training, making injection machine usage sips, making machine checking forms, improving the recording system to be more complete and clear, paying attention to the quality and age of each year. spare parts, making machines damaged, calculating the availability of materials properly, buying ezhaust and adjusting the electrical power needed.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil : 1810312036] [Penguji II : Siti Rohana Nasution] [Penguji Utama : Muhammad As'adi] [Penguji I : Akkemad Nidhomuz Zaman]
Uncontrolled Keywords: Overall Equipment Effectiveness, Six Big Losses, Fault Tree Analysis, Failure Mode and Effect Analysis, 5W-1H Method, Injection Molding
Subjects: T Technology > T Technology (General)
T Technology > TJ Mechanical engineering and machinery
T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Agusthina -
Date Deposited: 04 Feb 2022 03:11
Last Modified: 04 Feb 2022 03:11
URI: http://repository.upnvj.ac.id/id/eprint/16116

Actions (login required)

View Item View Item