Mega Nilam Sari, . (2021) USULAN PERBAIKAN PADA PROSES BONGKAR MUAT PETIKEMAS DENGAN PENDEKATAN LEAN. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (1MB) |
|
Text
AWAL.pdf Download (1MB) |
|
Text
BAB 1.pdf Download (1MB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
BAB 5.pdf Download (1MB) |
|
Text
DAFTAR PUSTAKA.pdf Download (1MB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (416kB) |
Abstract
PT. K is the ports that provides container loading and unloading services. To ensure the container flows, PT K has an operational performance standards to carrying out the loading and unloading process. One of the indicators is the effective time ratio. The effective time ratio that does not reach the standards is influenced by the length of service time for loading and unloading activities. This is caused by waste activities in the process while the ship is at the mooring. This study aims to identify waste and provide a proposed improvement plan to reduce waste that occurs using a lean approach. The method used is a questionnaire of seven waste, BPM, VALSAT, FTA and HOR. Calculation results based on the seven waste questionnaire, it was found the most dominant waste, that is waste of waiting with an average value of 3.6, waste of transportation with an average value of 3.4, waste of inventory with an average value of 3.2 and defects with an average value of 2.8. Based on the FTA analysis, it was found that the waste caused by slow docking process, unprepared workers, troubled and congestion in the field. Based on the HOR analysis, it was found that a proposed improvement plan in the form of a strategy for handling the highest causes of waste, there are carrying out equipment maintenance, making a maintenance report cards, conducting work evaluation meetings, strengthening internet connections and adding RTG and QCC units.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | {No.Panggil: 1710312018} [Pembimbing: Siti Rohana Nasution] [Penguji 1: Muhamad As'adi] [Penguji 2: Alina Cynthia Dewi] |
Uncontrolled Keywords: | Waste, Lean, VALSAT, FTA, HOR |
Subjects: | T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | Mega Nilam Sari |
Date Deposited: | 22 Sep 2021 05:47 |
Last Modified: | 22 Sep 2021 05:47 |
URI: | http://repository.upnvj.ac.id/id/eprint/11636 |
Actions (login required)
View Item |