Asta Nusa Abdul Aziz, . (2021) ANALISIS NETWORK PLANNING REPARASI KAPAL FLAMINGO AWB 3377GT DENGAN METODE CRITICAL PATH METHOD. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf.pdf Download (10kB) |
|
Text
AWAL.pdf Download (983kB) |
|
Text
BAB.1.pdf Download (154kB) |
|
Text
BAB.2.pdf Restricted to Repository UPNVJ Only Download (406kB) |
|
Text
BAB.3.pdf Restricted to Repository UPNVJ Only Download (63kB) |
|
Text
BAB.4.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
BAB.5.pdf Download (11kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (7kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (132kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (469kB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (759kB) |
Abstract
Network planning or also known as network planning is a model used in the implementation of ship repair projects. The network planning analysis method applied to the repair of the AWB Flamingo 3377 GT ship uses the CPM (Critical Path Method) method. The purpose of getting this is for network planning on ship repair work so that there are no delays and to find out which activities are critical paths to minimize delays in completing ship repairs. The type of research used is descriptive qualitative and quantitative research. The research variables used are the creation of a network, allowing the earliest time of occurrence of an event (EET)and the slowest time of occurrence of an event (LET), critical path and completiontime of ship repair projects. From the results of this study, it can be seen that the results of network planning in ship repair projects using the CPM method found 11critical activations/activities, namely pre docking, water jet & fresh water rinse, sandblasting hull, trash bin, frame and 1 ton bracket , welding fittings, ultra sonic test, painted hull (bottop) to top side, checking & repairing, and post docking. By using CPM, the difference in the completion time is 17 days, while the previous duration of completion was 20 days. For comparison, the price of the CPMmethod is greater than the previous calculation, which is Rp. 5,000,000 (five million rupiah)
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No. Panggil 1710313012] [Pembimbing : Amir Marasabessy] [Penguji 1 : M Rusdy Hatuwe[ [Penguji 2 : Amir Marasabessy] |
Uncontrolled Keywords: | Network Planning, Critical Path Method, ship repair, critical path |
Subjects: | V Naval Science > VM Naval architecture. Shipbuilding. Marine engineering |
Divisions: | Fakultas Teknik > Program Studi Teknik Perkapalan (S1) |
Depositing User: | Asta Nusa Abdul Aziz |
Date Deposited: | 21 Sep 2021 06:39 |
Last Modified: | 21 Sep 2021 06:39 |
URI: | http://repository.upnvj.ac.id/id/eprint/11515 |
Actions (login required)
View Item |