IMPLEMENTASI DALAM MENENTUKAN PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE NAWAZ ENSCORE & HAM (NEH) UNTUK MEMINIMUMKAN MAKESPAN DI PT. DURAQUIPT CEMERLANG

Herinaldi Yoshua Sumanda M, . (2020) IMPLEMENTASI DALAM MENENTUKAN PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE NAWAZ ENSCORE & HAM (NEH) UNTUK MEMINIMUMKAN MAKESPAN DI PT. DURAQUIPT CEMERLANG. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (14kB)
[img] Text
AWAL.pdf

Download (559kB)
[img] Text
BAB 1.pdf

Download (141kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (192kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (160kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (879kB)
[img] Text
BAB 5.pdf

Download (123kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (118kB)
[img] Text
DAFTAR RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (103kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository UPNVJ Only

Download (287kB)

Abstract

PT. Duraquipt Cemerlang is a company that applies flowshop systems and First Comer First Serve (FCFS) rule. This method has several disadvantages, one of which is having large turnaround time (makespan). By having a large makespan,then there will be looses, starting with time and expenses. The purpose of this research is to minimize the makespan of PT. Duraquipt Cemerlang and determine the best job order to be used at PT. Duraquipt Cemerlang. Therefore, to be able the answer these purpose, Nawaz Enscore & Ham (NEH) method is used, which is in this methode scheduling, the total work time of all machines is greater, must be given a higher weight to be entered first in schedule. By using these methods, it will be known which method will produc the smallest makespan and which job sequence should be applied to the company. Based on the calculation results, it is obtained that with the NEH method, the value of makespan is 23925 minutes, with job sequence 3-1-2. As for the method applied by the company, namely FCFS, the value of makespan is 44010 minutes with job sequence 2-3-1.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil : 1610312051] [Penguji 2 (Dosen Pembimbing) : M. Rachman Waluyo] [Penguji 1 ; Nurfajriyah] [Penguji Utama : Halim Mahfud]
Uncontrolled Keywords: flowshop, makespan, job, NEH, FCFS.
Subjects: T Technology > T Technology (General)
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Herinaldi Yoshua Sumanda M
Date Deposited: 24 Jun 2021 04:19
Last Modified: 24 Jun 2021 04:19
URI: http://repository.upnvj.ac.id/id/eprint/6447

Actions (login required)

View Item View Item