PENERAPAN STRATEGI MITIGASI RISIKO SUPPLY CHAIN DENGAN PENDEKATAN MODEL HOUSE OF RISK (HOR) PADA PT. EXSO SARANA GLOBALINDO

Rian Permana, . (2026) PENERAPAN STRATEGI MITIGASI RISIKO SUPPLY CHAIN DENGAN PENDEKATAN MODEL HOUSE OF RISK (HOR) PADA PT. EXSO SARANA GLOBALINDO. Tesis thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (289kB)
[img] Text
AWAL.pdf

Download (906kB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (331kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (449kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (310kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (328kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository staff only

Download (257kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (638kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (28MB)
[img] Text
Surat Peryataan Publikasi - Rian Permana.pdf
Restricted to Repository staff only

Download (81kB)

Abstract

This study examines supply chain risk mitigation at PT Exso Sarana Globalindo (ESG), a project-based supplier in the energy and marine sector characterized by import–local procurement and multi-region distribution to onshore–offshore sites. The study aims to identify supply chain risk events and risk agents, prioritize dominant risk sources, and develop operational mitigation actions. The research applies Supply Chain Operations Reference (SCOR) process mapping and the House of Risk (HOR) method (stages 1 and 2). Data were collected through semi-structured in-depth interviews, field observations, and internal document review, and analyzed using a descriptive qualitative approach. The results identify 35 risk events across SCOR processes and 18 risk agents. HOR 1 prioritizes risk agents using Aggregate Risk Potential (ARP) and Pareto analysis, yielding 10 priority risk agents that account for 81.80% of total risk exposure. HOR 2 generates 12 preventive actions (PA1–PA12) and ranks them using the effectiveness-to-difficulty ratio (ETDk). The highest-priority actions emphasize cross-functional coordination anchored to a project calendar, material master data standardization, strengthened QC/handling/packing procedures, and site readiness confirmation prior to dispatch, supported by a phased implementation roadmap. The study provides a structured basis for managerial decision-making by focusing mitigation efforts on dominant risk sources and strengthening supply chain governance at ESG.

Item Type: Thesis (Tesis)
Additional Information: [No.Panggil: 2310121011] [Pembimbing: Taufiq Hidayat] [Penguji 1: Alfatih S. Manggabarani] [Penguji 2: Ranila Suciati]
Uncontrolled Keywords: supply chain risk management, SCOR, House of Risk, ARP, risk mitigation, energy–marine projects.
Subjects: H Social Sciences > H Social Sciences (General)
H Social Sciences > HB Economic Theory
Divisions: Fakultas Ekonomi dan Bisnis > Program Studi Manajemen (S2)
Depositing User: RIAN PERMANA
Date Deposited: 28 Aug 2026 03:35
Last Modified: 28 Aug 2026 03:35
URI: http://repository.upnvj.ac.id/id/eprint/52224

Actions (login required)

View Item View Item