Audryant Edhie Putra, . (2025) ANALISIS PEMILIHAN SUPPLIER AYAM MENGGUNAKAN METODE FUZZY ANALYTICAL HIERARCHY PROCESS (F-AHP) DAN ZERO-ONE GOAL PROGRAMMING (ZOGP) DI PT. XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
![]() |
Text
ABSTRAK.pdf Download (308kB) |
![]() |
Text
AWAL.pdf Download (1MB) |
![]() |
Text
BAB 1.pdf Restricted to Repository UPNVJ Only Download (382kB) |
![]() |
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (639kB) |
![]() |
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (425kB) |
![]() |
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (2MB) |
![]() |
Text
BAB 5.pdf Download (341kB) |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (314kB) |
![]() |
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (212kB) |
![]() |
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (2MB) |
![]() |
Text
HASIL PLAGIARISM.pdf Restricted to Repository staff only Download (20MB) |
![]() |
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (408kB) |
Abstract
PT XYZ is a food and baverage company that produces a variety of chicken based menu items. Currently, the company is facing challenges in determining the best Supplier for its main ingredient. This study applied the Fuzzy Analytical Hierarchy Process (F-AHP) method to determine the priority level of each criterion, sub-criterion, and Supplier alternative based on its sub-criteria. Zero-One Goal Programming (ZOGP) was then used to make the final decision on Supplier selection. The F-AHP calculations revealed that Quality is the highest-priority criterion, with a weight of 0,464 (46,4%), followed by Price 0,178 (17,8%), Delivery 0,165 (16,5%), Performance History 0,137 (13,7%), and Warranties and Claim Policies 0,056 (5,6%). Supplier 2 ranked first among the Suppliers with a weight of 0,256 (25,6%), followed by Supplier 1 0,180 (18%), Supplier 4 0,154 (15,4%), Supplier 3 0,145 (14,5%), Supplier 6 0,139 (13,9%), and Supplier 5 0,126 (12,6%). Based on the ZOGP results, Supplier 2 was selected as the preferred Supplier with a decision value of 1.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 2110312068] [Pembimbing: Mohammad Rachman Waluyo] [Penguji 1: Yulizar Widiatama] [Penguji 2: Muhamad As’adi] |
Uncontrolled Keywords: | F-AHP, ZOGP, Supplier |
Subjects: | H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | AUDRYANT EDHIE PUTRA |
Date Deposited: | 08 Aug 2025 09:05 |
Last Modified: | 08 Aug 2025 09:05 |
URI: | http://repository.upnvj.ac.id/id/eprint/39257 |
Actions (login required)
![]() |
View Item |