Utari Sekar Ramadhani, . (2025) PERANCANGAN STRATEGI PERAWATAN MESIN POPE REEL DENGAN MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II DAN MVSM PADA PT. PAPERTECH INDONESIA. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
![]() |
Text
ABSTRAK.pdf Download (14kB) |
![]() |
Text
AWAL.pdf Download (766kB) |
![]() |
Text
BAB 1.pdf Restricted to Repository UPNVJ Only Download (54kB) |
![]() |
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (334kB) |
![]() |
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (153kB) |
![]() |
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (1MB) |
![]() |
Text
BAB 5.pdf Download (16kB) |
![]() |
Text
DAFTAR PUSTAKA.pdf Download (139kB) |
![]() |
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (91kB) |
![]() |
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (1MB) |
![]() |
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (16MB) |
![]() |
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (428kB) |
Abstract
PT. Papertech Indonesia is a company operating in the waste paper industry, specifically in the recycling and reprocessing of paper. The production process involves the use of various machines for paper recycling. The machine examined in this study is the Pope Reel machine, which functions as the paper rewinder and recorded the highest downtime, totaling 145.32 hours during the period of July to December 2024. The company currently conducts maintenance once a month; however, maintenance activities are sometimes carried out unexpectedly due to sudden failures. The objective of this study is to identify critical components, develop a machine maintenance schedule, and map the maintenance process flow. To address these issues, an effective and efficient maintenance strategy is required. Therefore, the researcher employs the Reliability Centered Maintenance II (RCM II) method to determine the appropriate maintenance strategy and the Maintenance Value Stream Mapping (MVSM) approach to support process improvement, enhancement, and to visualize an efficient machine maintenance flow. This study identifies three critical components, each with a specific maintenance interval: the Primary Arm (35 hours), the Secondary Arm (493 hours), and the Loading Cylinder (336 hours). The proposed strategy results in a 55% improvement in maintenance efficiency for the Pope Reel machine.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 2110312018] [Pembimbing: Muhamad As'adi] [Penguji 1: Yulizar Widiatama] [Penguji 2: Siti Rohana Nasution] |
Uncontrolled Keywords: | Maintenance, Pope Reel, RCM II, MVSM |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TJ Mechanical engineering and machinery T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | UTARI SEKAR RAMADHANI |
Date Deposited: | 04 Aug 2025 06:38 |
Last Modified: | 04 Aug 2025 06:38 |
URI: | http://repository.upnvj.ac.id/id/eprint/39208 |
Actions (login required)
![]() |
View Item |