ANALISIS DAN MINIMASI WASTE DENGAN PENDEKATAN LEAN MANUFACTURING PADA PROSES PRODUKSI LABEL DI PT KAHAR DUTA SARANA DENGAN METODE 5 WHYS

SYIHAN KARAMI, . (2024) ANALISIS DAN MINIMASI WASTE DENGAN PENDEKATAN LEAN MANUFACTURING PADA PROSES PRODUKSI LABEL DI PT KAHAR DUTA SARANA DENGAN METODE 5 WHYS. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (335kB)
[img] Text
AWAL.pdf

Download (875kB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (528kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (662kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (885kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (295kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (331kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (208kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (9MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (605kB)

Abstract

PT Kahar Duta Sarana is a label manufacturing company that has been established for decades. However, in its production process, several wasteful practices have been identified which can hinder its productivity level. Based on the results of a 7 waste questionnaire, two dominant wastes were identified: waste of waiting and waste of inappropriate processing. Waste of waiting occurs in the printing process where operators have to wait for the machine unit to be cleaned, thus hindering the setup process. Waste of inappropriate processing occurs in both printing and cutting processes, involving color setting and die setting activities, where operators often make mistakes due to a lack of comprehensive understanding of the operated machines, affecting the lead time. Through SMED calculations and root cause analysis using the 5 Whys method, proposed improvements were obtained to reduce lead time by 910.35 seconds or approximately 15.2 minutes from the initial condition with a lead time of 9105.41 seconds or about 152 minutes to 8195.08 seconds or about 136 minutes. Additionally, there was a reduction in NVA and NNVA activities by 373.35 seconds from the activity time on the CVSM.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 2010312090] [Pembimbing: Mohammad Rachman Waluyo] [Penguji 1: Yulizar Widiatama] [Penguji 2: Nurfajriah]
Uncontrolled Keywords: VSM, SMED, 5 whys, Lean Manufacturing, 7 waste
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: SYIHAN KARAMI
Date Deposited: 02 Aug 2024 01:04
Last Modified: 02 Aug 2024 01:04
URI: http://repository.upnvj.ac.id/id/eprint/32031

Actions (login required)

View Item View Item