ANALISIS BEBAN KERJA UNTUK MENENTUKAN TENAGA KERJA YANG OPTIMAL PADA KARYAWAN DI PT IJI PROYEK KALIBATA CITY DENGAN MENGGUNAKAN METODE MODIFIED FULL TIME EQUIVALENT (M-FTE)

Yeni Lisaw Maha, . (2023) ANALISIS BEBAN KERJA UNTUK MENENTUKAN TENAGA KERJA YANG OPTIMAL PADA KARYAWAN DI PT IJI PROYEK KALIBATA CITY DENGAN MENGGUNAKAN METODE MODIFIED FULL TIME EQUIVALENT (M-FTE). Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (329kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf
Restricted to Repository UPNVJ Only

Download (492kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (631kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (398kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (331kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (221kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (122kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (4MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (14MB)

Abstract

PT IJI is a company that operates in the field of outsource facility services, trade, and technology, one of its projects is at Mall Kalibata City. During the course of the project there were some problems such as the monthly activity plan (RKB) that had been drawn up by the team was not implemented according to the schedule. This is because of the shortage of labor and the workload received by the workers on this project is excessive. Thus, the measurement of the workload as the basis for determining the optimum workforce needs should be done. In this study, using the Modified Full Time Equivalent (MFTE) method to identify the amount of workload received by the worker and determine the optimum workforce. The results of the calculation of the MFTE method, the whole worker as the object of this study had overload with an average value of MFTE of 2.27 (overload) and was given a proposal with an addition of the workforce of 15 people and the size of the value MFTE after the proposed improvement of the average workload to 1.14 (fit). Keyword : Workload, Optimum Workforce, MFTE, Work Sampling

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 2010312047] [Pembimbing: Santika Sari] [Penguji 1: Muhammad As'Adi] [Penguji 2: Nur Fajriah]
Uncontrolled Keywords: Workload, Optimum Workforce, MFTE, Work Sampling
Subjects: G Geography. Anthropology. Recreation > GT Manners and customs
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Yeni Lisaw Maha
Date Deposited: 23 Jan 2024 00:44
Last Modified: 15 Feb 2024 04:29
URI: http://repository.upnvj.ac.id/id/eprint/28363

Actions (login required)

View Item View Item