PENERAPAN LEAN MANUFACTURING MENGGUNAKAN VALUE STREAM MAPPING UNTUK IDENTIFIKASI NON VALUE ACTIVITY PADA PRODUKSI PACKAGING DI PT. TWH

Maria Dwiana Puspa Nugraheni, . (2022) PENERAPAN LEAN MANUFACTURING MENGGUNAKAN VALUE STREAM MAPPING UNTUK IDENTIFIKASI NON VALUE ACTIVITY PADA PRODUKSI PACKAGING DI PT. TWH. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (11kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (100kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (851kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (243kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB 5.pdf

Download (78kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (85kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (85kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (504kB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (16MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (491kB)

Abstract

PT. TWH is a manufacturing company that produces packaging boxes. Based on field observations and interviews, in the production process there are several indications of waste, therefore identification is needed to minimize or even eliminate activities that are not added value. The purpose of this study is to identify the causes of waste caused by non-value added activity using the Lean Manufacturing method and provide recommendations for improvement in reducing non-value added activity, then a more efficient design using system simulation using ProModel software. Lean Manufacturing methods used in this study include Value Stream Mapping (VSM) and Value Stream Analysis Tools (VALSAT). To determine the critical waste by using a questionnaire 7 waste. The results of the three critical wastes obtained are based on the 7 waste questionnaire data processing, namely, defects, unnecessary motion, and waiting. Furthermore, to find the root of the waste problem that occurs in this study using a Fault Tree Analysis (FTA) diagram, then a simulation is carried out to describe the conditions before and after repairs. Based on the results of data processing, it was found that the recommendations for improvement proposals could reduce the lead time by 89.64 minutes or equivalent to 35.49% and the results from the design of the improved simulation model experienced an increase in production output to 2,149,275 pcs with a percentage increase of 93.84%.

Item Type: Thesis (Skripsi)
Additional Information: [No.Panggil: 1910312024] [Pembimbing: Siti Rohana Nasution] [Penguji 1: Muhamad As’ Adi] [Penguji 2: Yulizar Widiatama]
Uncontrolled Keywords: Keywords: Lean Manufacturing, Value Stream Mapping (VSM), Value Stream Analysis Tools (VALSAT)
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Maria Dwiana Puspa Nugraheni
Date Deposited: 31 Jan 2023 02:50
Last Modified: 31 Jan 2023 02:50
URI: http://repository.upnvj.ac.id/id/eprint/22929

Actions (login required)

View Item View Item