Irene Fritzdwina, . (2022) PEMERATAAN LINI PRODUKSI DENGAN MENGGUNAKAN PENDEKATAN LINE BALANCING DAN TIME STUDY UNTUK MENINGKATKAN EFISIENSI DI PT. XYZ. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (12kB) |
|
Text
AWAL.pdf Download (1MB) |
|
Text
BAB 1.pdf Download (440kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (791kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (502kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (4MB) |
|
Text
BAB 5.pdf Download (26kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (137kB) |
|
Text
RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (145kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
HASIL PLAGIARISM.pdf Restricted to Repository staff only Download (27MB) |
|
Text
ARTIKEL KI.pdf Restricted to Repository staff only Download (921kB) |
Abstract
PT. XYZ is a company that produces bras and briefs with the production of more than 450 styles every year, either styles that are produced continuously, seasonal, or one-time production. This study uses the line balancing method to balance the assembly line to be more effective and efficient. The results obtained from this study for line balancing styles Y52075, YZPE, and YZBDW are by comparing Ranked Position Weight, Region Approach and Largest Candidate Rule methods with different results. From the analysis of the analysis of the three methods for the Y50275, YZPE, and YZBDW styles, the best is the Ranked Position Weight (RPW) method because it has efficiency values of 66.922%, 70.677%, and 75.156%. The Balance Delay values are 33.078%, 29.323%, and 24.844%. The smoothness index values are 162,755, 173,500, and 122,954 seconds. After that, the approach is carried out using a simulation model with Arena Software. The results of the actual and proposed models show that the proposed simulation results have an increase in the average output.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 1810312059] [Pembimbing: Siti Rohana Nasution] [Penguji 1: Nanang Alamsyah] [Penguji 2: Nurfajriah] |
Uncontrolled Keywords: | Line Balancing, Time Study, and Arena |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TS Manufactures |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | Irene Fritzdwina |
Date Deposited: | 26 Jul 2022 05:45 |
Last Modified: | 26 Jul 2022 05:45 |
URI: | http://repository.upnvj.ac.id/id/eprint/18997 |
Actions (login required)
View Item |