PERANCANGAN PERAWATAN MESIN BLISTERING LINE 1 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II DAN AGE REPLACEMENT DI PT. ABC

Renesha Fitri Asilah, . (2022) PERANCANGAN PERAWATAN MESIN BLISTERING LINE 1 DENGAN METODE RELIABILITY CENTERED MAINTENANCE II DAN AGE REPLACEMENT DI PT. ABC. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (41kB)
[img] Text
AWAL.pdf

Download (993kB)
[img] Text
BAB 1.pdf

Download (209kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (692kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (182kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (600kB)
[img] Text
BAB 5.pdf

Download (42kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (110kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (16kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (2MB)
[img] Text
HASIL PLAGIARISME.pdf
Restricted to Repository staff only

Download (12MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (360kB)

Abstract

PT. ABC is a company engaged in the pharmaceutical sector, the products produced are tablets, creams, and ointments. Production activities require machines to work continuously so that a lot of damage occurs. To reduce the damage, it is necessary to have an optimal maintenance policy so that the machine can operate properly. In this study, Reliability Centered Maintenance (RCM) II and Age Replacement were used to solve this problem. Blistering Line 1 machine is an automatic drug packaging machine used in the primary drug packaging process. Blistering Line 1 machine has the highest downtime so research will focus on the machine components. With this maintenance analysis research, it is expected that the machine's reliability can be increased and minimize downtime on production machines. The results of the FMEA calculation data processing show that the critical components are heating, forming, and sealing. Furthermore, the inspection interval on heating is 67 hours with a reliability of 99.9%, on forming is 65 hours with a reliability of 99.6%, on sealing is 47 hours with a reliability of 95.82%. Then the results of the preventive replacement interval on heating are 170 hours with a reliability of 74.4%, on forming is 156 hours with a reliability of 64.6%, on sealing is 95 hours with a reliability of 67.4%. The proposal given is in the form of a gantt chart for the mid-2022 maintenance interval.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil: 1810312078] [Pembimbing: James Julian] [Penguji 1: Nanang Alamsyah] [Penguji 2: Santika Sari]
Uncontrolled Keywords: Reliability Centered Maintenance II, Downtime, Age Replacement, Gantt chart
Subjects: T Technology > TS Manufactures
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Renesha Fitri Asilah
Date Deposited: 21 Jul 2022 05:59
Last Modified: 15 Feb 2023 03:41
URI: http://repository.upnvj.ac.id/id/eprint/18660

Actions (login required)

View Item View Item