Irsyad Mawardi, . (2021) ANALISIS NILAI EFEKTIVITAS DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DAN SIX BIG LOSSES PADA METAL SPINNING MACHINE DI PT. X. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.
Text
ABSTRAK.pdf Download (69kB) |
|
Text
AWAL.pdf Download (711kB) |
|
Text
BAB 1.pdf Download (409kB) |
|
Text
BAB 2.pdf Restricted to Repository UPNVJ Only Download (751kB) |
|
Text
BAB 3.pdf Restricted to Repository UPNVJ Only Download (371kB) |
|
Text
BAB 4.pdf Restricted to Repository UPNVJ Only Download (1MB) |
|
Text
BAB 5.pdf Download (347kB) |
|
Text
DAFTAR PUSTAKA.pdf Download (139kB) |
|
Text
DAFTAR RIWAYAT HIDUP.pdf Restricted to Repository UPNVJ Only Download (78kB) |
|
Text
LAMPIRAN.pdf Restricted to Repository UPNVJ Only Download (931kB) |
|
Text
HASIL PLAGIARISME.pdf Restricted to Repository staff only Download (13MB) |
|
Text
Artikel KI.pdf Restricted to Repository staff only Download (407kB) |
Abstract
PT. X is a company engaged in the lighting industry. In this study, the problem that occurs is the metal spinning machine, which is one of the production points that plays the most role in the manufacture of downlight products. The problem that occurs is the lack of maintenance carried out so that it causes production delays or what is meant is the effectiveness of the metal spinning machine is low, due to production delays. Based on that problem, the Overall Equipment Effectiveness (OEE) method is used to measure the effectiveness of the machine, then look for the main factors that cause engine damage using the Six Big Losses method. After obtaining the causative factors, Fault Tree Analysis (FTA) is used to analyze the problem aimed at finding the root cause of the failure of the problem as a basis for providing recommendations for improvement. From the research results, the OEE value on the machine is 76.53%, which means that it can be said that the OEE value is still below world standards. Of the Six Big Losses, the biggest damage that makes the OEE value low is idling minor and high stoppages at 38.86%. The cause of the problem is the operator is incompetent, there is no scheduled repair, the machine breakdown is quite long, the setup is not in accordance with the standard SOP. The suggestions for improvement are providing regular training programs, implementing Autonomous maintenance, making check sheets on machines and making Standard Operational Procedures (SOP) on machines.
Item Type: | Thesis (Skripsi) |
---|---|
Additional Information: | [No.Panggil: 1810312021] [Pembimbing: Siti Rohana Nasution] [Penguji 1: Muhammad As'adi] [Penguji 2: Akhmad Nidhomuz Zaman] |
Uncontrolled Keywords: | FTA, Metal Spinning, OEE, Six Big Losses |
Subjects: | T Technology > T Technology (General) |
Divisions: | Fakultas Teknik > Program Studi Teknik Industri (S1) |
Depositing User: | Irsyad Mawardi |
Date Deposited: | 03 Feb 2022 05:03 |
Last Modified: | 03 Feb 2022 05:04 |
URI: | http://repository.upnvj.ac.id/id/eprint/16102 |
Actions (login required)
View Item |