PERENCANAAN SISTEM HEATING, VENTILATION AND AIR CONDITIONING (HVAC) PADA POWER GENERATION SUBSTATION BUILDING PB - 12 PROYEK MCL

Wanda Nabilah Putri, . (2021) PERENCANAAN SISTEM HEATING, VENTILATION AND AIR CONDITIONING (HVAC) PADA POWER GENERATION SUBSTATION BUILDING PB - 12 PROYEK MCL. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (427kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB 1.pdf

Download (222kB)
[img] Text
BAB 2.pdf
Restricted to Repository UPNVJ Only

Download (440kB)
[img] Text
BAB 3.pdf
Restricted to Repository UPNVJ Only

Download (217kB)
[img] Text
BAB 4.pdf
Restricted to Repository UPNVJ Only

Download (767kB)
[img] Text
BAB 5.pdf

Download (210kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (212kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (139kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (4MB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository staff only

Download (584kB)

Abstract

Along with the development of the times, progress in various sectors ranging from technology, transportation, industry and other sectors has also increased, which clearly affects the quality of existing air. By having a good system and a good air circulation in the room, makes the room can be used optimally. A heating, ventilation and air conditioning system or what is commonly called HVAC is an air conditioning system that takes into account the relative humidity and focuses on the health and comfort factors of the occupants in the room. The first thing that needs to be done in planning an HVAC system is calculating the cooling load. This calculation can be done manually using the CLTD (Cooling Load Temperature Difference), CLF (Cooling Load Factor) and SCL (Solar Cooling Load) methods. After getting the data, then the electric heater capacity can be determined in order to reduce the relative humidity. From this research, shows that PB - 12 has a total cooling load of 46.85 TR in the LER zone and 2.76 TR in the LIR zone. The cooling load calculation is a combination of the sensible heat and latent heat. With dry bulb temperature of 37 ◦C and wet bulb temperature of 29.7◦C, it can be seen that the relative humidity of PB – 12 is 58◦C.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil: 1710311066] [Pembimbing 1: Muhammad As'adi] [Pembimbing 2: Fahrudin] [Penguji 1: Damora Rhakasywi] [Penguji 2: Sigit Pradana]
Uncontrolled Keywords: Heating, Ventilation and Air Conditioning (HVAC), Cooling Load, Relative Humidity
Subjects: T Technology > T Technology (General)
T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Teknik > Program Studi Teknik Mesin (S1)
Depositing User: Wanda Nabilah Putri
Date Deposited: 08 Mar 2021 06:12
Last Modified: 08 Mar 2021 06:20
URI: http://repository.upnvj.ac.id/id/eprint/9548

Actions (login required)

View Item View Item