PERANCANGAN PERAWATAN MESIN CTCM (CONTINUOUS TANDEM COLD MILL) PT. XYZ DENGAN METODE SIMULASI MONTE CARLO

Ahmad Tesa Karyadi, . (2020) PERANCANGAN PERAWATAN MESIN CTCM (CONTINUOUS TANDEM COLD MILL) PT. XYZ DENGAN METODE SIMULASI MONTE CARLO. Skripsi thesis, Universitas Pembangunan Nasional Veteran Jakarta.

[img] Text
ABSTRAK.pdf

Download (194kB)
[img] Text
AWAL.pdf

Download (1MB)
[img] Text
BAB.1.pdf

Download (414kB)
[img] Text
BAB.2.pdf
Restricted to Repository UPNVJ Only

Download (841kB)
[img] Text
BAB.3.pdf
Restricted to Repository UPNVJ Only

Download (583kB)
[img] Text
BAB.4.pdf
Restricted to Repository UPNVJ Only

Download (1MB)
[img] Text
BAB.5.pdf

Download (263kB)
[img] Text
DAFTAR PUSTAKA.pdf

Download (181kB)
[img] Text
RIWAYAT HIDUP.pdf
Restricted to Repository UPNVJ Only

Download (308kB)
[img] Text
LAMPIRAN.pdf
Restricted to Repository UPNVJ Only

Download (758kB)
[img] Text
ARTIKEL KI.pdf
Restricted to Repository UPNVJ Only

Download (538kB)

Abstract

PT. XYZ is a steel industry, there are many machines used in this industry, one of which is CTCM. The CTCM machine is the machine with the highest downtime during 2019. If the value of downtime is high and this problem continues it does not rule out the possibility of a lot of late production, of course, this will greatly affect production schedules and impact losses for the company, therefore a maintenance schedule is needed an optimal engine. To implement an optimal maintenance schedule, a study was carried out by designing the maintenance of CTCM engine components by simulating damage that would occur using the Monte Carlo simulation and redesigning the preventive maintenance schedule in order to reduce the value of downtime. The purpose of this study was to determine the level of reliability of the component parts CTCM machines, Predict TTF based on the results of Monte Carlo simulations on each component of the CTCM engine as a basis for determining optimal maintenance schedules. For the proposed scheduling of the CTCM Machine on the KP-130 maintenance is done every 45 days, KP-145 every 16 days, KP-190 every 32 days, KP-305 every 34 days, KP-310 every 4 days, KP-340 every 5 days, KP-360 every 42 days, KP-420 every 56, KP-490 every 34 days, KP-500 every 4 days. With the proposed maintenance period on each component of the CTCM machine, the reliability is 85%.

Item Type: Thesis (Skripsi)
Additional Information: [No. Panggil: 1610312 Pembimbing 1:LDamora Rhakasywi] [Penguji 2 Muhammad As'adi ] [Penguji Utama: Reda Rizal]
Uncontrolled Keywords: CTCM, Maintenance Scheduling, Monte Carlo simulations
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Teknik > Program Studi Teknik Industri (S1)
Depositing User: Ahmad Tesa Karyadi
Date Deposited: 24 Jun 2021 06:25
Last Modified: 15 Feb 2023 03:54
URI: http://repository.upnvj.ac.id/id/eprint/7137

Actions (login required)

View Item View Item