EVALUATION OF THE IMPACT OF ONLINE MONITORING ON LEAD TIME IN AN EXPERIMENTAL ASSEMBLY LINE

Esa Belia, . (2026) EVALUATION OF THE IMPACT OF ONLINE MONITORING ON LEAD TIME IN AN EXPERIMENTAL ASSEMBLY LINE. JOURNAL OF INFORMATICS AND TELECOMMUNICATION ENGINEERING, 10 (1). pp. 208-221. ISSN 2549-6247

[img] Text
2210311018_ArtikelKI.pdf
Restricted to Repository UPNVJ Only

Download (836kB)

Abstract

Advances in modern manufacturing require real-time visibility into production data to avoid delayed decision-making and inventory buildup; however, current monitoring technologies are expensive and complex for small industries. This study was conducted on an experimental assembly line by designing, implementing, and evaluating an IoT-based online monitoring system. The experiment compared the 4-station toy airplane assembly process before and after system implementation, with time data validated using the adequacy test, Shapiro-Wilk normality test, and paired t-test. The analysis results showed a significant improvement in production flow performance, with a reduction in lead time at each workstation of 25,21%, 22,37%, 21,91%, dan 30,35%., respectively. Withreal-time data transmission to a cloud database, early detection of bottlenecks through work-in-process monitoring can be performed, which subsequently improves the balance of the assembly line.

Item Type: Article
Additional Information: {No.Panggil: 2210311018} [Pembimbing : Vina Sari Yosephine} {Penguji 1 : Muchamad Oktaviandri} {Penguji 2 : Sigit Pradana}
Uncontrolled Keywords: Online Monitoring, Internet of Things (IoT), Lead Time, Assembly Line, Infrared Sensor.
Subjects: T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Teknik > Program Studi Teknik Mesin (S1)
Depositing User: ESA BELIA
Date Deposited: 28 Aug 2026 01:30
Last Modified: 28 Aug 2026 01:30
URI: http://repository.upnvj.ac.id/id/eprint/52535

Actions (login required)

View Item View Item